The new under construction Kanturk National School Mill Road Kanturk Co. Cork
Planning application 20/6494
DecisionConditional grant
Decided18 January 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near The new under construction Kanturk National School Mill Road Kanturk Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 21/4724Construction of a new two-storey primary school with a total internal floor area of 3253sqm on a green field site, consisting of 16no. classrooms, a general purpose hall, library, support accommodation, a 3 no. classroom special needs unit/ASD unit and all ancillary works. This includes for the provision of 37no. on-site car parking spaces and 3 no. disabled parking spaces, vehicular access roads, set down area, pedestrian access pathways, ball courts, play areas, bin store, bicycle shelters, oil storage tank, new connection to existing foul drainage system, surface water drainage system with storm water attenuation connected to existing surface water network at entrance to Market Place. Diversion of on-site overhead electricity cables to underground, signage and landscaping, as part of the overall site development works on a site area of circa 2.389 hectares. The development also comprises a portion of a new link road with a priority junction off Mill Road - Extension of duration of permission granted under planning reference: 15/04230 - An Bord Pleanala reference: PL 04.245860 / 0.0 km away / 17 May 2021Granted
- 18/7172The installation of 84 roof-mounted photovoltaic (PV) panels on the South-facing roof structure of the Northern wing of the project, and all associated works, at the proposed new two storey primary School (Cork County Council ref 15/4230). The addition of these photovoltaic panels is in order to comply with the requirements of TGD Part L 2017 – Buildings other than Dwellings, which requires the provision of 10% on-site renewable energy sources in addition to the buildings’s primary energy usage being reduced by a further 10%. DoES TGD 033 outlines that renewable requirements must be met by the use of photovoltaic panels. / 0.0 km away / 31 January 2019Granted
- 15/4230Construction of a new two-storey primary school with a total internal floor area of 3253sqm on a green field site, consisting of 16no. classrooms, a general purpose hall, library, support accommodation, a 3 no. classroom special needs unit/ASD unit and all ancillary works. This includes for the provision of 37no. on-site car parking spaces and 3 no. disabled parking spaces, vehicular access roads, set down area, pedestrian access pathways, ball courts, play areas, bin store, bicycle shelters, oil storage tank, new connection to existing foul drainage system, surface water drainage system with storm water attenuation connected to existing surface water network at entrance to Market Place. Diversion of on-site overhead electricity cables to underground, signage and landscaping, as part of the overall site development works on a site area of circa 2.389 hectares. The development also comprises a portion of a new link road with a priority junction off Mill Road / 0.0 km away / 09 November 2015Granted
- 20/5341To construct a new dwelling house. / 0.1 km away / 23 October 2020Granted
- 16/6191Construction of: (1) Conservatory to side of existing dwelling, (2) Extension to rear of existing dwelling, (3) Alterations to existing elevations and all associated site works. / 0.1 km away / 24 January 2017Granted
- 08/10312Demolition of existing bungalow and construction of building for use as a mental health day centre facility, storage shed, new site entrance and associated site works / 0.2 km away / 24 February 2009Granted
- 06/5777Extension to Mental Health day centre facility / 0.2 km away / 16 May 2006Granted
- 05/8864Relocation of entrance, construction of extension and change of use from dwelling to Mental Health day care facility and associated works / 0.2 km away / 03 February 2006Granted