Gilead Sciences Ireland UC IDA Business and Technology Park Anngrove Carrigtwohill, Co. Cork
Planning application 21/5251
DecisionConditional grant
Decided01 July 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Gilead Sciences Ireland UC IDA Business and Technology Park Anngrove Carrigtwohill, Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 12/5750Completion of construction of production/warehouse building, two storey production/packaging building to include first floor plant room areas, construction of two storey Backbone building extension, construction of roof mounted items of plant and equipment, yard and docking areas, construction of louvre shading to existing south office elevation, modifications to existing car parking and landscaped areas, provision for total of 447 no. car parking spaces built on phased basis, alterations to internal roads system, revised fencing, gates, landscape modifications to include new berms and miscellaneous works and associated site works and services - Extension of duration of permission granted under Planning Reg. No. 07/12296 / 0.1 km away / 21 September 2012Granted
- 03/2534Infrastructural development to include extension to roadworks and footpaths,new roundabout, foul and surface water drainage and gas main / 0.1 km away / 21 July 2003Granted
- 14/4634Construction of a waste management building, waste management yard and associated works / 0.1 km away / 22 May 2014Granted
- 05/3601Construction of 2.4 m. high galvanised security fence around existing facility, car park, finished site ground levels which have been revised from planning reg. no. S/03/2622, and the additional construction of new 1.3 m. high timber post and wire fence around site boundary with 3 no. free standing signs / 0.1 km away / 19 July 2005Granted
- 03/2622SEE APPLICATION FOR DETAILS / 0.1 km away / 21 July 2003Granted
- 20/6166Revisions to a previously permitted development (Planning Reg. No. 19/5836) comprising the revised routing of approx. 78m of a permitted dedicated shared use cycleway and footpath. The revised routing incorporates a revised crossing point by the shared cycleway/footpath of an internal Business Park road. The development also incorporates ancillary revisions to existing safety barrier provision. All on a site area of 1,271sqm approx. / 0.1 km away / 25 November 2020Granted
- 18/4371Construct a new two storey annex with fire escape stairs to the western elevation of an existing manufacturing building, together with the development of an access road for the relocated Intermediate Bulk Container Bund, at the plant facility in Carrigtwohill, including associated ancillary site works. The ground floor will consist of a cleanroom to be utilised for the operation of small batch product packaging operations and the first floor will be utilised to house plant and equipment associated with ground floor cleanroom. Site works will include the relocation of existing Gas Bottle Storage, as well as relocation of an existing Aco channel drain servicing the external yard area. Demolitions and alterations to the existing western facade are required to tie the new structure into the existing building / 0.1 km away / 05 April 2018Granted
- 19/4200Construction of a new two storey bin washer centre extension to the north elevation of the existing manufacturing building consisting of a new bin washer centre at ground floor with walk-on-ceiling above and plant and equipment room at first floor level. Works include alterations to existing internal layout including all necessary demolitions and modifications as well as all associated site development works including diversion of existing and process water drainage, new surface water and process water draining tie-ins, demolition of existing external ramp, modifications to external stair, new pedestrian paths and vehicular safety barrier. / 0.1 km away / 25 March 2019Granted