CARRIGTWOHILL IND. ESTATE CARRIGTWOHILL IND. ESTATE ANNGROVE,
Planning application 03/2534
DecisionConditional grant
Decided21 July 2003
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near CARRIGTWOHILL IND. ESTATE CARRIGTWOHILL IND. ESTATE ANNGROVE,?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 25/5189Permission for upgrade works to two existing controlled pedestrian crossings at the IDA Business and Technology Park. The works include installing raised crossing points, new section of footpath, line marking, traffic poles with lights and tactile paving. We also intend to install a new raised uncontrolled crossing at the roundabout at the rear of the IDA Business and Technology Park. These works include upgrade works to the existing footpath, installation of a raised crossing point, new sections of footpath, tactile paving and line marking. / 0.1 km away / 12 August 2025Granted
- 20/6166Revisions to a previously permitted development (Planning Reg. No. 19/5836) comprising the revised routing of approx. 78m of a permitted dedicated shared use cycleway and footpath. The revised routing incorporates a revised crossing point by the shared cycleway/footpath of an internal Business Park road. The development also incorporates ancillary revisions to existing safety barrier provision. All on a site area of 1,271sqm approx. / 0.1 km away / 25 November 2020Granted
- 21/5251Installation of photovoltaic panels on the existing rooftop of the packaging and warehouse buildings. The proposed development will comprise of 1,458 no. new photovoltaic panels, total area of 3,340 m sq. on a mix of roof mounted and ballasted frames together with all ancillary cabling and electrical infrastructure modules over 3 phases. / 0.1 km away / 01 July 2021Granted
- 18/5915Site development works involving the excavation of existing ground (approximately 36,000m3 of subsoil) from the north end of the site at IDA Industrial Estate. The development is covered by an existing Industrial Emissions Directive Licence number P1046-01. / 0.1 km away / 13 September 2018Granted
- 12/5750Completion of construction of production/warehouse building, two storey production/packaging building to include first floor plant room areas, construction of two storey Backbone building extension, construction of roof mounted items of plant and equipment, yard and docking areas, construction of louvre shading to existing south office elevation, modifications to existing car parking and landscaped areas, provision for total of 447 no. car parking spaces built on phased basis, alterations to internal roads system, revised fencing, gates, landscape modifications to include new berms and miscellaneous works and associated site works and services - Extension of duration of permission granted under Planning Reg. No. 07/12296 / 0.2 km away / 21 September 2012Granted
- 25/6841Fournier Laboratories Ireland Ltd. (AbbVie), intend to apply for the following at their Production Facility at the IDA Industrial Estate, Anngrove Townland, Carrigtwohill, Co Cork: 1) Permission for Retention of the following, a) Change to external cladding to previously permitted Juvéderm Extension Project, Planning Ref: 23/04159, b) Two Storey Extension to Existing Modular Building Block No. 01 (Total Floor Area = 244m2) to previously permitted Juvéderm Extension Project, Planning Ref: 23/04159, c) Single Storey Extension to Existing Modular Building Block No. 02 (Total Floor Area = 54m2) to previously permitted Juvéderm Extension Project, Planning Ref: 23/04159, d) Two Storey Modular Office Block No. 03 (Total Floor Area = 554m2). 2) Permission for Construction of the following, a) Proposed Stores Building No. 01 (Total Floor Area = 225m2), b) Proposed Stores Building No. 02 (Total Floor Area = 225m2), c) Proposed Warehouse Extension to Existing Building (Total Floor Area = 70m2), d) Demolition & Proposed Upgrade to Main Entrance (Total Floor Area = 24.4m2), e) Proposed Upgrade of Cladding to External Elevations of Main Production Building, f) Proposed Demolition of Existing Warehouse Building (Total Floor Area = 207.5m2). The proposed development is covered by an Existing Industrial Emissions Directive Licence Number P1046-01. The Planning Application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority, County Hall, Carrigrohane Road, Cork, during its public opening hours, i.e. 9.00a.m. to 4.00 p.m. Monday to Friday (excluding public holidays). A submission or observation in relation to the application may be made in writing to the Planning Authority on payment of the prescribed fee within the period of 5 weeks beginning on the date of receipt by the Authority of the application, and such submissions and observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions, or may refuse to grant permission. / 0.2 km away / 07 April 2026Granted
- 04/2405Diversion of overhead transmission line - 110kv / 0.2 km away / 02 June 2004Granted
- 18/4371Construct a new two storey annex with fire escape stairs to the western elevation of an existing manufacturing building, together with the development of an access road for the relocated Intermediate Bulk Container Bund, at the plant facility in Carrigtwohill, including associated ancillary site works. The ground floor will consist of a cleanroom to be utilised for the operation of small batch product packaging operations and the first floor will be utilised to house plant and equipment associated with ground floor cleanroom. Site works will include the relocation of existing Gas Bottle Storage, as well as relocation of an existing Aco channel drain servicing the external yard area. Demolitions and alterations to the existing western facade are required to tie the new structure into the existing building / 0.2 km away / 05 April 2018Granted