IDA Business & Technology Park Anngrove Carrigtwohill Co.Cork
Planning application 25/5189
DecisionConditional permission
Decided12 August 2025
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near IDA Business & Technology Park Anngrove Carrigtwohill Co.Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 18/5915Site development works involving the excavation of existing ground (approximately 36,000m3 of subsoil) from the north end of the site at IDA Industrial Estate. The development is covered by an existing Industrial Emissions Directive Licence number P1046-01. / 0.1 km away / 13 September 2018Granted
- 03/2534Infrastructural development to include extension to roadworks and footpaths,new roundabout, foul and surface water drainage and gas main / 0.1 km away / 21 July 2003Granted
- 20/6166Revisions to a previously permitted development (Planning Reg. No. 19/5836) comprising the revised routing of approx. 78m of a permitted dedicated shared use cycleway and footpath. The revised routing incorporates a revised crossing point by the shared cycleway/footpath of an internal Business Park road. The development also incorporates ancillary revisions to existing safety barrier provision. All on a site area of 1,271sqm approx. / 0.1 km away / 25 November 2020Granted
- 25/6841Fournier Laboratories Ireland Ltd. (AbbVie), intend to apply for the following at their Production Facility at the IDA Industrial Estate, Anngrove Townland, Carrigtwohill, Co Cork: 1) Permission for Retention of the following, a) Change to external cladding to previously permitted Juvéderm Extension Project, Planning Ref: 23/04159, b) Two Storey Extension to Existing Modular Building Block No. 01 (Total Floor Area = 244m2) to previously permitted Juvéderm Extension Project, Planning Ref: 23/04159, c) Single Storey Extension to Existing Modular Building Block No. 02 (Total Floor Area = 54m2) to previously permitted Juvéderm Extension Project, Planning Ref: 23/04159, d) Two Storey Modular Office Block No. 03 (Total Floor Area = 554m2). 2) Permission for Construction of the following, a) Proposed Stores Building No. 01 (Total Floor Area = 225m2), b) Proposed Stores Building No. 02 (Total Floor Area = 225m2), c) Proposed Warehouse Extension to Existing Building (Total Floor Area = 70m2), d) Demolition & Proposed Upgrade to Main Entrance (Total Floor Area = 24.4m2), e) Proposed Upgrade of Cladding to External Elevations of Main Production Building, f) Proposed Demolition of Existing Warehouse Building (Total Floor Area = 207.5m2). The proposed development is covered by an Existing Industrial Emissions Directive Licence Number P1046-01. The Planning Application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority, County Hall, Carrigrohane Road, Cork, during its public opening hours, i.e. 9.00a.m. to 4.00 p.m. Monday to Friday (excluding public holidays). A submission or observation in relation to the application may be made in writing to the Planning Authority on payment of the prescribed fee within the period of 5 weeks beginning on the date of receipt by the Authority of the application, and such submissions and observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions, or may refuse to grant permission. / 0.1 km away / 07 April 2026Granted
- 07/11379Two storey extension to existing production building and associated site works / 0.1 km away / 26 November 2007Granted
- 07/8840Construction of first floor laboratory extension to existing research and development laboratory building, concrete apron, footpath and associated site works / 0.1 km away / 14 August 2007Granted
- 07/4281Retention of 2 no. temporary prefabricated buildings comprising of 1 no. single storey building for office/commercial use and 1 no. two storey building for office/commercial use and canteen / 0.1 km away / 02 May 2007Granted
- 05/9466Construction of two storey extension to manufacturing facility comprising of production and plant area over two floors with combined extended area, hard standings, extension to car park, roadways, footpaths and associated site works / 0.1 km away / 20 February 2006Granted