Former Ardscoil Phobail Bheanntrai Knocknamuck (townland) Bantry Co. Cork
Planning application 22/119
DecisionUnconditional grant
Decided21 April 2022
Application typeEXTENSION OF DURATION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Former Ardscoil Phobail Bheanntrai Knocknamuck (townland) Bantry Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 19/7471) The construction of 1 no. plant enclosure located to the rear of the main office building which will accommodate a sub-station and will be the control room for the heating, cooling and air-filtration systems; 2) alterations to permission as per granted under Pl. Reg. No: 17/167 to consist of permission for: i) internal and external alterations to the permitted gound floor of the main office building ii) alterations to the existing entrance of the main office building including layout of the stepped / ramped access (in lieu of lobby extension and access as permitted); iii) retaining the existing lobby extension to the front (permitted to be demolished under Pl. Reg. No: 17/167); iv) all associated site development works including alterations to the permitted parking layout and construction of a pedestrian access pathway within the site / 0.0 km away / 06 April 2020Granted
- 17/167Development at the former Ardscoil Phobail Bheanntraí comprising 1) the retention of the change of use from school to office on part of the ground floor (558 sq metres); and permission for 2) the change of use of the remaining ground floor and first floor from school to office (982 sq metres); 3) demolition of the single storey annex (209 sq metres) to the northwest of the existing building and construction of a new two storey extension (1,085 sq metres) to be used as an An Post sorting office at ground floor level and office use at first floor level, with an associated entrance foyer/lift; and 4) all associated ancillary development works including staff facilities (gym, canteen), parking, drainage, and landscaping / 0.0 km away / 24 July 2017Granted
- 01/4265Erection of temporary prefabricated classroom to the rear of existing building / 0.0 km away / 20 September 2001Granted
- 01/2246Extension to funeral home / 0.1 km away / 13 December 2001Granted
- 04/4734Demolition of funeral home and construction of funeral and detached office building / 0.1 km away / 09 November 2004Granted
- 17/554Demolition of existing stone wall and closing up of existing entrance to site, construction of new site boundary wall and widening of existing footpath, construction of access road to lower ground floor of funeral home and new vehicular entrance with access control barrier, demolition of bridge parapet, construction of bridge widening works and new parapet wall and all associated site works / 0.1 km away / 12 October 2017Granted
- 09/60Demolition of all onsite buildings, including 3no. houses (with the exception of a shed (157sqm) to be retained on Chapel Street), and the development of mixed use scheme, incorporating four new buildings, a surface carpark with new entrance from Chapel Street, a footbridge across the Mill Stream, and all associated site works and landscaping, including outdoor public and semi-public spaces and restricted vehicle entrance and exit points from Chapel Street to the site; One of the proposed buildings is a district courthouse which is subject to a part 9 application and is described in this for information purposes only; Descriptions of the individual elements of the scheme are set out below: District Courthouse: subject to a separate Part 9 application; Social Welfare Office building: a three-storey building comprising 926sq.m space for social welfare offices over three floors, 506sq.m general office space over three floors, and a 43sq.m café unit at ground floor level. The public pedestrian entrance is from the shared outdoor space, with a staff entrance from Chapel Street; Funeral Home: a two-storey building comprising 327sq.m space. Public pedestrian access is from the shared outdoor space, and from a deck along the reinstated stream edge; Townhouses: a three-storey building comprising 3no. individual town-houses, of 149sq.m, 125sq.m and 140sq.m respectively: One townhouse has private footbridge access to private garden to the south of the Mill Stream, adjacent to the proposed car-park. The townhouses are accessed from the shared outdoor space and have balconies overhanging the Mill Stream; Car-park: a surface car-park comprising 79no. spaces over 2050sq.m of surface area, to the south side of the Mill Stream. The vehicular entrance to the car-park is adjacent to the retained shed on Chapel Street; Site-works and landscaping: the 4no. buildings comprising the scheme are situated on a shared hard landscaped space, with selected specimen trees, paving, lighting and seating. The stream edge is to be built up in its present position, with selected balustrading to match balconies and footbridge / 0.1 km away / 20 March 2009Granted
- 18/104Construction of detached domestic storage shed and all associated site works / 0.1 km away / 04 May 2018Granted