The townlands of Slievereagh And Coomnaclohy Ballyvourney Co Cork
Planning application 22/5791
DecisionConditional grant
Decided15 May 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near The townlands of Slievereagh And Coomnaclohy Ballyvourney Co Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 23/4455Alterations to the dimensions of the 7 no. wind turbines permitted as part of the Knocknamork Renewable Energy development (planning reference 19/4972). The proposed development includes the provision of 7 no. wind turbines with an overall ground to blade tip height of 175m (an increase of 25m, from 150m), a rotor blade length of 75m and a hub height of 100m, and all associated site development and ancillary works, an operational period and planning permission duration to align with the existing permission (planning reference no. 19/4972 ) is sought. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and accompany this application / 0.4 km away / 08 May 2023Granted
- 19/4972Renewable energy development consisting of the provision of a 7 turbine wind farm, solar photovoltaic array, electricity substation, battery storage compound and all associated works consisting of the following, i. Up to 7 wind turbines with an overall blade tip height of up to 150 metres and all associated foundations and hard-standing areas; ii. Up to 70,000sq.m solar photovoltaic array, with up to 17 associated inverters and 2 no. control cabins; iii. 1 no. borrow pit, iv. 1 No. permanent meteorological mast with a maximum height of up to 100 meters; v. Upgrade of existing and provision of new site access roads, vi. 1 no. 38kV electrical substation with 1 no. control building with welfare facilities, associated electrical plant and equipment security fencing and waste water holding tank; vii battery storage compound accommodating 4 no. battery storage containers, security fencing, and associated electrical plant and equipment, viii. Forestry felling ix. 1 no. temporary construction compound, x. Site drainage xi. All associated internal underground cabling; xii. 38kV underground grid connection cabling; xiii. All associated site development and ancillary works. The proposed development will have an operational life of 30 years from the date of commissioning of the development and the application seeks a ten year planning permission. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development. / 0.4 km away / 18 November 2019Granted
- 24/6000Permission for upgrade works to approximately 0.4km of existing road to facilitate access to the permitted Knocknamork Renewable Energy Development (Pl. Ref. No. 19/4972, as amended under Pl. Ref. No. 22/5791 and 23/4455), a temporary construction compound including 2 no. site offices and staff facilities, drainage and all associated site works. / 0.7 km away / 16 December 2024Granted
- 09/5528Dwellinghouse (change of plan from that granted under Pl. Reg. No. 08/4457) / 1.4 km away / 06 July 2009Granted
- 08/4457Dwellinghouse, detached garage and installation of sewage treatment unit / 1.4 km away / 18 March 2008Granted
- 20/6146To construct a dwelling house and all associated site works. / 1.4 km away / 05 February 2021Granted
- 04/1689Construction of slatted cubicle house, silage base, milking parlour, dairy, plant room, collection yard, collection yard tank and associated works / 1.4 km away / 06 May 2004Granted
- 08/9076Dwelling / 1.5 km away / 18 March 2009Granted