Slievereagh TD Slievereagh Co. Cork.
Planning application 24/6000
DecisionConditional grant
Decided16 December 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Slievereagh TD Slievereagh Co. Cork.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 22/5791The development will consist of the provision of the following: (i) Underground electrical cabling (33kV); (ii) Access roads (new and upgrade of existing); (iii) Amendments to the permitted developments (Ref. No. 19/4972), including extension to the borrow pit and the omission of the 38kV electrical substation, 38kV underground cabling and battery storage compound; (iv) Site drainage; and (v) All associated site development ancillary works and apparatus. The development subject to this application forms part of grid connection and access arrangements which will facilitate the permitted Knocknamork Renewable Energy Development, Cork County Council Ref. No. 19/4972. Concurrent planning applications in relation to the overall grid connection and access arrangements will also be lodged to Kerry County Council and An Bord Pleanála. An operational period and extended planning permission duration to align with the permitted Knocknamork Renewable Energy Development, Cork County Council Ref. No. 19/4972 is sought. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and accompanies this application. / 0.7 km away / 15 May 2023Granted
- 23/4455Alterations to the dimensions of the 7 no. wind turbines permitted as part of the Knocknamork Renewable Energy development (planning reference 19/4972). The proposed development includes the provision of 7 no. wind turbines with an overall ground to blade tip height of 175m (an increase of 25m, from 150m), a rotor blade length of 75m and a hub height of 100m, and all associated site development and ancillary works, an operational period and planning permission duration to align with the existing permission (planning reference no. 19/4972 ) is sought. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and accompany this application / 1.0 km away / 08 May 2023Granted
- 19/4972Renewable energy development consisting of the provision of a 7 turbine wind farm, solar photovoltaic array, electricity substation, battery storage compound and all associated works consisting of the following, i. Up to 7 wind turbines with an overall blade tip height of up to 150 metres and all associated foundations and hard-standing areas; ii. Up to 70,000sq.m solar photovoltaic array, with up to 17 associated inverters and 2 no. control cabins; iii. 1 no. borrow pit, iv. 1 No. permanent meteorological mast with a maximum height of up to 100 meters; v. Upgrade of existing and provision of new site access roads, vi. 1 no. 38kV electrical substation with 1 no. control building with welfare facilities, associated electrical plant and equipment security fencing and waste water holding tank; vii battery storage compound accommodating 4 no. battery storage containers, security fencing, and associated electrical plant and equipment, viii. Forestry felling ix. 1 no. temporary construction compound, x. Site drainage xi. All associated internal underground cabling; xii. 38kV underground grid connection cabling; xiii. All associated site development and ancillary works. The proposed development will have an operational life of 30 years from the date of commissioning of the development and the application seeks a ten year planning permission. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development. / 1.0 km away / 18 November 2019Granted
- 08/4168Demolition of derelict dwelling and construction of dwelling and installation of treatment plant / 1.4 km away / 05 March 2008Granted
- 07/6811Construction of slatted cattle shed, concrete silage slab, concrete dungstead and associated site works and retention of existing straw bedding shed / 1.5 km away / 24 May 2007Granted
- 08/9076Dwelling / 1.5 km away / 18 March 2009Granted
- 04/1689Construction of slatted cubicle house, silage base, milking parlour, dairy, plant room, collection yard, collection yard tank and associated works / 1.5 km away / 06 May 2004Granted
- 11/5616Demolition of existing farm dwelling and attached shed and construction of new dwellinghouse directly south of existing and installation of new suitably sized wastewater treatment unit and percolation area to replace existing septic tank and associated site works / 1.5 km away / 19 September 2011Granted