ESB Aghada Generating Station Ballincarroonig Aghada Co Cork
Planning application 23/5104
DecisionConditional grant
Decided02 November 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near ESB Aghada Generating Station Ballincarroonig Aghada Co Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 20/6011Permission for development on a 1.81 ha site which is licenced by the Environmental Protection Agency under an Industrial Emissions (IE) Licence (Ref. P0561-05) and a Lower Tier COMAH site and therefore falls under the requirements of the control of Major Accident Hazard Regulations (COMAH) Regulations, 2015. The development will consist of a 75 MWe (electrical output) aero derivative gas fired turbine, including the following elements: (a) 1 No. turbine module (c.535 sq.m., c.15.2m high) in a fully enclosed weatherproof acoustic enclosure including a c.30m high stack, selective catalytic reduction (SCR), gas turbine and air intake; (b) supporting items of plant including: step up transformer with firewall (c.192 sq.m.); bunded station service transformer (c.11 sq.m); single storey control/electrical room (c.150 sq.m.); bunded ammonia storage tank (c.20 sq.m.); gas compressor (c.128sq.m.); gas compressor cooler (c.28 sq.m.); single storey building containing a fire suppression system and gas bottle storage (c.79 sq.m.); fin fan coolers (c.53 sq.m.); lube oil skid (c.32 sq.m.); fenced gas receiving station (c.11 sq.m.); (c) external service areas including a maintenance laydown area and an ammonia unloading area; (d) connections to existing site services networks including gas, liquid fuel, electrical, water and wastewater and an underground surface water attenuation tank connecting to surface water drains; (e) all other ancillary and miscellaneous site works including site clearance; site access and a temporary construction compound. [For information – the planning application represents a resubmission of a similar 55MW development approved by CCC under Reg. Ref. 19/05411]. The planning permission is being sought for a 10 year duration. The application relates to a development which comprises or is for the purposes of an activity requiring an Industrial Emissions Directive (IED) licence and full details of the proposed development and its anticipated environmental impacts will be notified to the Environmental Protection Agency (EPA). A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. / 0.1 km away / 10 November 2020Granted
- 19/5411A 55 MWe (electrical output) aero derivative gas fired turbine, including the following elements: (a) 1 No. Turbine module (c.535 sq.m., c.15.2m high) in a fully enclosed weatherproof acoustic enclosure including a c.30m high stack, selective catalytic reduction (SCR), gas turbine and air intake; (b) supporting items of plant including: step up transformer with firewall (c.192 sq. m.); bunded station service transformer (c.11 sq. m.); single storey control/electrical room (c.150 sq. m.); bunded ammonia storage tank (c.20 sq. m.); gas compressor (c.128 sq. m); gas compressor cooler (c.28 sq. m.); single storey building containing a fire suppression system and gas bottle storage (c.79 sq. m.); fin fan coolers (c.53 sq. m.); lube oil skid (c.32 sq. m.); fenced gas receiving station (c.11 sq. m.); (c) external service areas including a maintenance laydown area and an ammonia unloading area; (d) connections to existing site services networks including: gas, liquid fuel, electrical, water, wastewater, and an underground surface water attenuation tank connecting to surface water drains; (e) all other ancillary and miscellaneous site works including site clearance; site access and a temporary construction compound. Planning permission is being sought for a duration of 10 years. The application relates to a development which comprises or is for the purposes of an activity requiring an Industrial Emissions Directive (IED) licence and full details of the proposed development and its anticipated environmental impacts will be notified to the Environmental Protection Agency (EPA). A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. A 1.81 ha site located to the east of the R630; located inside the Aghada Generating Station, which is licenced by the Environmental Protection Agency under an Industrial Emissions (IE) Licence [Ref.P0561-05] and a Lower Tier COMAH site and therefore falls under the requirements of the Control of Major Accident Hazard Regulations (COMAH) Regulations, 2015. / 0.1 km away / 02 October 2019Granted
- 18/5659The development of a c.19 MW capacity battery storage facility located within a secured compound, on a 0.65 Ha site, and will –subject to detailed design, commercial and technical considerations; include; (a) up to 6 No. battery storage units [each typically comprising a containerised battery (c.12.2m x 2.5m x 3.2m), HVAC (c2.7m x 2.7m), inverter (c.3m x 3m) and transformer (c.3.3m x 3.3m)]; (b) a 28sq.m single storey control equipment building; (c) a 28 sq.m single storey switchgear building; (d) ancillary electrical plant including a transformer and var support unit; (e) a c.15.6m high lightning mast and c.18m high SCADA communications mast; (f) a 2.6m high chainlink fence and access gate, with primary access via the existing station and temporary access via the existing boundary onto the R630; (g) ancillary site works including site clearance and the installation of site services. Licenced by the Environmental Protection Agency under an Industrial Emissions (IE) Licence [Ref. P0561-05] and a Lower Tier COMAH site and therefore falls under the requirements of the Control of Major Accident Hazard Regulations (COMAH) Regulations, 2015. / 0.1 km away / 20 August 2018Granted
- 20/4294Development on a a c. 1.8 ha site, on ESB lands. The development will consist of a c.19 MW capacity battery storage facility located within a secured compound, and will - subject to detailed design, commercial and technical considerations, include: (a) a control building (c. 112 sq. m., c. 4.7 m high); (b) plant and equipment comprising: (1) up to 12 no. battery container units (c. 30 sq. m. and up to c. 4.7 m high) with roof mounted HVACs; (2) up to 6 no. battery unit transformers on concrete plinths (c. 11 sq. m. and c. 4 m high); (3) up to 6 no. inverter units (c. 30 sq. m. and c. 3 m high); (4) a bunded house transformer (c. 20 sq. m. and c. 3.3 m high) with firewall on three sides; (5) an MV stepdown transformer (c. 60 sq. m. and c. 4.5 m high) with firewall on three sides; (6) VAR supports system on a concrete plinth (c.24 sq. m. and c. 3.4 m high); (7) cable trays and associated service connections; (8) up to 4 no. lightning masts (c. 20 m high); (9) a c. 18 m high SCADA pole; (10) a pole mounted security camera (c. 8.3 m high); (c) c. 2.6 m high palisade fencing and gates; (d) demolition of an existing building (c. 147 sq. m. and c.5.5 m high) and (e) ancillary site clearance and development works including provision of areas of hardstanding, internal access roads, and connections to site services networks. The planning permission is being sought for a 10 year duration. A Natura Impact Statement will be submitted to the Planning Authority with the application. Licensed by the Environment Protection Agency under an Industrial Emissions (IE) License [Ref. P0561-05] and a Lower Tier COMAH site and therefore falls under the requirements of the Control of Major Accident Hazard (COMAH) Regulations, 2015. / 0.2 km away / 09 April 2020Granted
- 05/1260Two storey extension above the existing workshop to be clad as per the existing buildings plus a glazed lobby entrance, connecting the upper floor to the existing control room / 0.3 km away / 27 April 2005Granted
- 04/5913A combined cycle gas turbine (CCGT) power plant, with an output of 380 - 450MW, The development will consist of a gas turbine, heat recovery steam generator; one exhaust stack of up to 70m in height, one by-pass stack of up to 50m high, steam turbine, workshops and stores, control and administration building, water treatment plant, cooling water pumphouse, 440m long submerged sea cooling water outfall pipe with elevated platform at the discharge point, electrochlorination plant, auxiliary boiler with 48m high stack, gas compressor, minor ancillary buildings, two oil tanks of up to 20m in height, three water tanks of up to 15m in height, electrical equipment, transformers, gas compound, sewage treatment plant, miscellaneous plant and equipment, site development, landscaping and fencing. The planning application includes 2 different design options / 0.3 km away / 23 September 2004Granted
- 14/6380Permission to erect a 36 metre high, free standing lattice telecommunication structure to facilitate the relocation of the existing cellular telemetry equipment from the rooftop of Boiler House No. 1 onto the proposed structure, enclosed within a 2.4 metre high palisade compound / 0.3 km away / 05 January 2015Granted
- 24/6510Permission for the replacement of approximately 324m of existing 2.4m high chainlink fencing and associated gates with 324m of new 2.4m high green palisade security fencing/gates and all associated site works. / 0.3 km away / 24 February 2025Granted