Carrigtwohill Quarry Ballyvodock West & Ballynabointra Carrigtwohill Co Cork
Planning application 24/6004
DecisionConditional grant
Decided18 March 2025
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Carrigtwohill Quarry Ballyvodock West & Ballynabointra Carrigtwohill Co Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 25/5885Permission for the erection of a hydrogenated vegetable oil (HVO) generator and associated works within the existing Carrigtwohill Quarry. The Carrigtwohill Quarry is an existing active quarry, located within the applicant's landholding, and covers an area of 91.92 hectares. The proposed development will comprise of: A HVO enclosed generator 6m long by 2.2 wide by 2.7m high; A fuel storage tank (internally bunded) (approx. 2.7m²); A transformer 2.4m long by 1.54m wide and 2.46m high; Reinforced concrete will be installed locally underneath the generator, fuel storage tank and transformer; 2.1m high palisade fencing surrounding generator and fuel storage tank and, demolition of a ca. 0.6m high wall for ca 13m length. The proposed development will be within an application area of 0.0341 hectares (ha) at the existing Carrigtwohill Quarry. / 0.2 km away / 05 November 2025Granted
- 09/5446Alterations to an existing natural gas above ground installation. Alterations will consist of the removal of the wall & roof of the existing regulation building & installation of boiler/instrumentation kiosk, associated underground & overground pipework, light column, 2.4m high palisade fencing & security gates / 0.3 km away / 29 June 2009Granted
- 19/5559The development will comprise an increase in the number of days when operations can take place outside of normal working hours at the existing asphalt plant, form 40 days per annum (previously permitted by Planning Ref: 16/5239) to 60 days per annum, all on an application site of 0.98 hectares. / 0.3 km away / 01 August 2019Granted
- 16/5239Permission is sought for extension of permitted operating hours at the existing asphalt plant on a 0.9 hectare site within Carrigtwohill Quarry at Ballyvodock West, Carrigtwohill, Co. Cork (previously permitted under Cork County Council Reg. No. S/01/4977). Permission is sought for asphalt production operations to commence at 6am Monday to Saturday inclusive and to cease at 19.00 hours Monday to Saturday inclusive;- and to take place outside of the proposed (amended) operational hours on not more than 40 days per annum. The proposed development will not result in any physical alteration to existing structures or to any change in current output rates / 0.3 km away / 26 September 2016Granted
- 18/6751The development comprises addition of a recycled asphalt products (RAP) plant to the existing asphalt plant (previously permitted under Cork County Council Reg. Ref. 01/4977) on a 0.53 hectare site within Carrigtwohill Quarry. The proposed RAP plant comprises two additional hoppers, a bottom-fed conveyor system and a raising elevator to deliver recyclable bituminous materials to the existing asphalt plant. The proposed development will not result in any change in permitted working hours or current production rates. Recycled bituminous material supplied to the RAP plant will be stored at an existing storage shed within the quarry. / 0.3 km away / 07 December 2018Granted
- 14/6635Construction and demolition waste recovery facility which provides for: the importation and re-use of naturally occurring inert soil and stone/construction and demolition waste to partially backfill and remediate part of the quarry; the importation, processing and recovery of inert construction and demolition waste (principally mixed concrete, blacktop, bricks, tiles and ceramics); establishment of a hardstanding area for stockpiling and crushing of waste materials and a waste inspection/quarantine shed / 0.4 km away / 24 August 2015Granted
- 11/4843Construction of a storey and a half dwelling with detached garage, septic tank and site entrance / 0.5 km away / 02 September 2011Granted
- 07/9441Dormer bungalow and sewage treatment unit / 0.5 km away / 12 December 2007Granted