CARK, NEW MILLS, LETTERKENNY PO
Planning application 2050798
DecisionConditional grant
Decided07 August 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Donegal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Donegal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near CARK, NEW MILLS, LETTERKENNY PO?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 1951995(A) DEMOLITION OF SUBSTRUCTURE REMAINS OF FORMER COTTAGE AND (B) CONSTRUCTION OF NEW SINGLE STOREY COTTAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS / 0.1 km away / 20 February 2020Granted
- 2461480ELEMENTS OF WIND FARM INFRASTRUCTURE AND RECTIFICATION OF ASSOCIATED RED LINE BOUNDARY / 1.5 km away / 15 May 2025Granted
- 2050835REVISIONS TO THE LAYOUT OF LENELEA WIND FARM (PLANNING REF:09/50116), 200M OF NEW SECTION OF TRACK AND MINOR ROAD IMPROVEMENTS WITHIN THE ADJACENT OPERATIONAL CARK (PLANNING REF: 02/8328), MEENTYCAT (01/8038) AND MEENALABAN (02/8008) WIND FARMS TO FACILITATE DELIVERY OF TURBINE COMPONENTS TO LENALEA. THE DEVELOPMENT WILL CONSIST OF THE FOLLOWING REVISIONS (1) OMMISSION OF PREVIOUSLY PERMITTED PERMANENT MET MAST AND ACCESS TRACK (2) OMMISSION OF PREVIOUSLY PERMITTED TURBINE T1 AND T4 AND ASSOCIATED TRACK (3) OMMISSION OF PREVIOUSLY PERMITTED TEMPORARY CONTRACTORS COMPOUND (4) OMMISSION OF PREVIOUSLY PERMITTED BORROW PIT (5) PROVISION OF PERMANENT MET MAST AND ACCESS TRACK AT A REVISED LOCATION (6) PROVISION OF A NEW MATERIAL STORAGE AREA (7) PROVISION OF TWO NEW EXCAVATED BORROW PITS (8) PROVISION OF A NEW TEMPORARY CONSTRUCTION COMPOUND (9) REVISED SUBSTATION LAYOUT TO MEET EIRGRID SPECIFICATION FOR 110 KV SUBSTATIONS (10) ADJUSTMENT TO ALIGNMENT OF PREVIOUSLY PERMITTED INTERNAL WIND FARM ROADS (11) ALL ASSOCIATED DRAINAGE AND CABLING (12) UPGRADING OF EXISTING ACCESS TRACK FROM OPERATIONAL CARK WIND FARM (PLANNING REF: 02/8328) TO THE PERMITTED SOUTHERN SITE ENTRANCE (13) LOCALISED WIDENING OF THE MAIN ACCESS ROAD THROUGH THE OPERATIONAL CARK (PLANNING REF: 02/8328), MEENTYCAT (01/8038) AND MEENALABAN (02/8008) WIND FARMS TO FACILITATE TURBINE COMPONENT DELIVERY TO LENALEA WIND FARM / 1.5 km away / 20 August 2020Granted
- 1951521CONSTRUCTION OF WIND FARM, CONSISTING OF 9 WIND TURBINES OF UP TO 85M HUB HEIGHT AND UP TO 100M BLADE DIAMETER WITH A TOTAL HEIGHT NOT EXCEEDING 135M, A PERMANENT METEROLOGICAL LATTICE MAST 85M HIGH, A SUBSTATION AND ASSOCIATED EQUIPMENT, A BORROW PIT, INTERNAL SITE TRACKS, DRAINAGE AND ASSOCIATED WORKS / 2.0 km away / 28 November 2019Granted
- 2450222REPOSITIONING OF A SECTION OF THE EXISTING 38KV LINE KNOWN AS THE CARK-CULLIAGH 38KV LINE CONSISTING OF INSTALLATION OF 8 NEW STRUCTURES. THE AFFECTED LINE SECTION IS 700M / 2.3 km away / 28 November 2024Granted
- 1850312INSTALLATION OF APPROXIMATELY 580M OF OVERHEAD ELECTRICAL CABLE, 2 NO. TWIN WOODEN POLE -SETS AND 2 NO. STEEL END MASTS AND THE DECOMMISSIONING OF APPROXIMATELY 203M OF EXISTING OVERHEAD ELECTRICAL CABLE, ON SITE AREA OF 5.72 HECTARES, FROM THE PROPOSED ELECTRICAL SUBSTATION AT LENALA WIND FARM (PREVIOUSLY GRANTED PERMISSION REF. 09/50116 AND 12/40091) TO EXISTING LETTERKENNY TO BINBANE 110KV OVERHEAD LINE / 2.5 km away / 26 April 2018Granted
- 2351609(1) INSTALLATION OF A GRID TRANSFORMER IN THE PREVIOUSLY CONSENTED AND CONSTRUCTED LENALEA WIND FARM SUBSTATION TO PLANNING REFERENCES: 09/50116 AND 20/50835 AND (2) CONSTRUCTION OF AN INDEPENDANT POWER PRODUCER (IPP) BUILDING (MEASURING 149M2) ALONG WITH ASSOCIATED GRID COMPENSATION EQUIPMENT, A DIESEL GENERATOR, AND UNDER GROUND CABLE TRENCHES LINKING THE PROPOSED IPP BUILDING TO THE GRID TRANSFORMER, AUXILIARY EQUIPMENT, A BOREHOLE AND ALL ANCILLARY WORKS / 2.5 km away / 14 December 2023Granted
- 1851082ERECTION OF A TWO STOREY VICTORIAN HOUSE WITH A DETACHED SIDE GARAGE, ACCESS DRIVEWAY TO SIDE ROAD, ONE WELL, SEPTIC TANK AND PERCOLATION AREA / 2.5 km away / 31 August 2018Granted