GrantedDecided 03 June 2021Dublin City Council

5-6, Meetinghouse Lane, Mary's Abbey, Dublin 7, D07 YP89

Planning application 3424/20
DecisionGrant permission
Decided03 June 2021
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Dublin City Council.
Development at a c. 0.056 ha site. The development comprises the refurbishment and extension of the existing buildings to provide a 9 no. storey development including hotel, restaurant and roof bar. The development will consist of: A. The removal of the roof of the 2 no. storey (over basement) building fronting Meetinghouse Lane and the interconnected 2 no. storey building to the rear (total floor area c. 647 sq.m); B. The refurbishment of the buildings including the removal of internal floors (238 sq.m) and walls to facilitate the core structure of the proposed development; C. The replacement of the roof at the interconnected 2 no. storey building to the rear and provision of new window openings at mezzanine level; D. The extension of the building fronting Meetinghouse Lane to provide a 9 no. storey (including mezzanine) hotel development comprising 65 no. bedrooms and licenced restaurant (c. 2,547 sq.m total floor area). E. Partial demolition of the western elevation fronting Meetinghouse Lane to provide new windows opening at and entrances and elevational treatment with canopy above hotel entrance and signage (2.2 sq.m) with additional signage at entrance arch at Meetinghouse Lane (2.6 sq.m); F. Publicly accessible enclosed glazed roof garden, licenced restaurant and bar (c. 271 sq.m) at top floor level; G. Reception, storage, kitchen and refuse store and WC at ground floor level, with management office, staff changing facilities and multipurpose meeting room at upper floors; H. Landscaped external courtyard (c. 123 sq.m) including 12 no. bicycle parking spaces. I. Provision of plant at basement, mezzanine and top floor levels and all associated site works, infrastructure and green roof. No works are proposed to the floorspace occupied by Evans Art Supplies.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.
ABP-310694-21Submitted 02 July 2021 / decided 19 April 2022
Status not recordedREMOVE CONDITIONS
  1. Appeal submittedAppeal reference ABP-310694-21
    02 July 2021
  2. Appeal decisionREMOVE CONDITIONS
    19 April 2022
No appeal document has been bound to this case yet; the timeline will enrich as indexing continues.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near 5-6, Meetinghouse Lane, Mary's Abbey, Dublin 7, D07 YP89?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →