GrantedDecided 21 March 2024Dublin City Council

0.212 Ha. site at Nos 133 & 133A Capel Street, Nos. 136A and 136B Capel Street, Nos 7 and 7A Meeting

Planning application 4554/23
DecisionGrant permission
Decided21 March 2024
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Dublin City Council.
PROTECTED STRUCTURE: 0.212 Ha. site at Nos 133 & 133A Capel Street, Nos. 136A and 136B Capel Street, Nos 7 and 7A Meetinghouse Lane and No.23, Little Mary Street, Dublin 1 (all Protected Structures with the exception of No. 7A Meetinghouse, Lane, RPS Nos. 1213, 5064, 8772). Part of the site is also known as the former Boland's Bakery (including structures to the rear opening onto Meeting House Lane) referred to as No133B Capel St. in the Record of Protected Structures (also RPS No. 1213). The development amends a permitted hotel development (as granted under DCC Reg. Ref. 3274/20 (ABP Reg. Ref. ABP-309470-21) and subsequently amended by DCC Reg. Ref. 3463/22). The proposed amendments will consist of the following modifications change of use of the function room in Building D to restaurant/bar (c.310 sqm); the increase in height of the permitted building C from c. 15.5 metres to c. 24.4 metres including plant (additional 3 no. storeys including rooftop plant) and associated increase in height of the link bridge between building C and building B; the reduction in height of the building connection between building A and Building B from c. 13.6 metres to c. 11.1 metres; revised back of house and core layout to accommodate an ESB substation and switch room at the south of building B; elevation changes including revised materials treatment s and the omission of cantilever terraces and structural projections on the north, west and east elevations of building B from third to seventh floor levels; the extension of the restaurant/bar in building B (c.60 sqm); changes to building B (former car park) including removal of an additional steel beam and building D (former meeting house) in the perforation of the southern wall to accommodate services and for openings and in the widening of a previously permitted opening to the northern wall; internal changes and reconfigurations; additional plant including roof top plant and all associated development works above and below ground. The proposed amendment will increase the gross floor area of the development from 5,449 sqm to 6,051 sqm and will increase the number of hotel bedrooms from 98 no. to 101 no.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City is in progress.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near 0.212 Ha. site at Nos 133 & 133A Capel Street, Nos. 136A and 136B Capel Street, Nos 7 and 7A Meeting?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.