GrantedDecided 31 May 2024Dublin City Council

3500/24: PERMISSION & RETENTION PERMISSION for development at the A&L Goodbody Building, 25-28 North Wall Quay, Dublin 1, DO1 H104. The site is bound by North Wall Quay to the south, an access ramp to existing basement to the east, Alderman Way to the north and the Spencer Hotel/an unnamed laneway to the west. The proposed development consists of the following amendments to the external elevations, internal layout and roof layout of the permitted building under Reg. Ref.: 3245/20 (as amended by Reg. Ref.: 4202/21) which is currently under construction: Planning permission is sought for: 1. Change in materiality to the southern stair cores. 2. Alterations to the main entrance to improve universal access. 3. Changes to the number and location of external doors. 4. Addition of a security gate to the basement car park. 5. Amendments to the reception and main core layouts. 6. Alterations to the landscaping to the south of the building. 7. Amendments to the landscaping to the north, east and west to allow for ESB access requirements (resulting in the loss of 1 no. car parking space) 8. Provision of a lightwell to the basement area. 9. Changes at basement level to provide additional space for Active commuter Facilities. 10. Reconfiguration of the basement layout resulting in a reduction from 64 no. to 58 no. car parking spaces and 8 no. to 3 no. motorcycle spaces. 11. Changes to layout of bicycle parking with no change to number of spaces. 12. Alterations to landscaping at level 6 and level 7. 13. Amendments at roof level including height of plan screen, extent of plant enclosure, increase in extent of proposed atrium roof and PV panels location. 14. Omit plant space in lieu of roof lights at level 1 roof. 15. Alterations to the level 6 south building permitted signage. 16. Change in location of permitted signage at main entrance. 17. New high level building signage to northeast core. Retention and completion permission is sought for: 1. Minor alterations to the FFLs of levels 1-7. 2. Change in modulation of channels to the main south elevation levels 2-5. 3. Change in materiality of spandrel panels to the north, east and west elevations. 4. Change in extent and materiality to northern stair cores. 5. Change to ground & 1st floor elevation to the west of the main entrance. 6. Alterations to the shape of the atrium and location of the feature stairs. 7. Addition of a roof access stairs. The above works result in an increase in GFA by 194 sq.m (125 sq.m proposed (planning permission) 69 sq.m to be retained (retention permission)) from 18,131 sq.m. (excluding basement of 3,708 sq.m.) to 18,325 sq.m. (excluding basement of 3,670 sq.m.).

25-28 North Wall Quay, Dublin 1, D01 H104
DecisionGrant permission
Decided31 May 2024
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near 25-28 North Wall Quay, Dublin 1, D01 H104?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →