3597/20: RETENTION: Retention Permission for balcony at first floor level at rear with glazed screening and chrome handrail and fittings.
23, Glasnevin Court, Glasnevin, Dublin 11
DecisionRefuse retention permissi
Decided09 December 2020
Application typeRetention Permission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 3739/22The proposed development will consist of amendments and additions to the existing building and site to provide for the use of the premises as a vehicular repair and service centre of 2121sq.m gross floor area and includes the following:-Amendments to the existing building (1808sqm) including revised internal layout to provide office, workshop, reception, a paint mixing room and staff areas 1844 sq.m. Amendments to all building elevations including refurbishment of existing brickwork and addition of cladding, reconfiguration and replacement of existing windows and doors including the insertion of new vehicle access doors and provision of building mounted signage to the elevations. Development of single storey tyre/valet/wash building (252sqm) to the rear of the existing building and provision of a bin store (25sqm) to the east of the existing building. Permission is also sought for a revised car parking layout to provide a total of 84no. spaces (including 13no. customer spaces) boundary fencing, 2no. vehicular access points and entrance gates from Slaney Road and all associated site and development works. / 0.4 km away / 13 December 2022Refused
- 2292/20The development will consist of construction of new three bed detached dormer bungalow with pitched roof and 6sqm solar panels. Three dormers total, all located to side, two to northern elevation (clear glazing) and one to southern elevation (opaque glazing). All to the rear of existing bungalow (No. 10). New vehicle access onto Glasnevin Downs with off street parking. All of the above to include new water connection and landscaping with all other services connected to existing. / 0.5 km away / 21 July 2020Refused
- 3977/19The development will consist of: construction of new three bed detached dormer bungalow with pitched roof and 6sqm solar panels. All to the rear of existing bungalow (No.10), and to be known as 10A Bellvue Cottages). New vehicle access onto Glasnevin Downs with off street parking. All of the above to include new water connection and landscaping with all other services connected to existing. / 0.5 km away / 05 November 2019Refused
- 4865/22Planning permission comprising the following buildings: Colorman Premises: (i) Colorman, Unit 1 Broombridge Industrial Estate, Broombridge Road, Dublin 11, D11 XO64, (ii) unnamed building to south of Unite 1 (no eircode), (iii) Units 13-14 (no eircode); (iv) Unit 17 Broombridge Industrial Estate, Broombridge Road, Dublin 11, D11 RX54, (v) Unit 6 Boyne Road, Dublin Industrial Estate, Dublin 11, D11 XD25, (vi) Unit nos. 72 & 73, D11 XN29 & D11 AY67 Moyle Road, Dublin Industrial Estate, Dublin 11. The development will consist of: (i) the demolition of all existing warehouse/factory/office buildings and all associated ancillary outbuildings and structures located on-site and the removal of the existing vehicular entrance via Broombridge Road; (ii) the construction of a mixed-use development comprising 14 no. retail /commercial units (2,899.66sq.m), a hotel (9,084.24sq.m), a creche (343.5sq.m.), office/remote working/co-working space (44,334.85sq.m.) and 304 no. residential apartments (71 no. one-bedroom, 130 no. two bedroom & 103 no. three bedroom) within 4 no. principle blocks (Blocks A-D) ranging in height from 2-16 storeys over basement level parking/plant area. Block A comprises a 12 storey over basement level (basement 1) building which includes 4 no. retail/commercial units at ground floor level and office space from first to eleventh floor level; Block B comprises a 2-10 storey over basement level (basement 1) building which includes 7 no. retail/commercial units at ground floor level with office space also included from ground to ninth floor level; Block C comprises a 8-11 storey over basement level (basement 2) building which includes 18 no. residential apartments 3 no. retail units and a creche at ground floor level with an additional 286 no. apartment s unit from first to tenth floor levels. Each apartment will benefit from access to private amenity space in the form of a balcony on all elevations and communal amenity space at surface level. Block D comprises a 16 storey over basement level (basement 2) building which includes a hotel (100 no. rooms - inclusive of a double/triple/family rooms) from ground to sixth floor level and thirteenth to fifteenth floor level with restaurant, bar, reception area and ancillary services room at ground floor level and gym, meeting, conference room and staff rooms at first floor level and recreational areas (spa/pool/gamesroom/multi-purpose hall) at thirteenth to fifteenth floor level. Block D will also include office space from seventh to twelfth floor level. The entire basement level (basement 1 & 2), will comprise a total of 296 no. carparking spaces (inclusive of 16 no. accessible spaces), 44 no. motorcycle parking spaces, 848 no. bicycle parking spaces and 30 no. cargo bicycle parking spaces to serve the overall development together with plant, storage, refuse storage and ancillary rooms. Basement 1 is accessed via Broombridge Road and basement 2 is accessed via Boyne/Moyle Road, (iii) provision of a new undercroft vehicular/pedestrian/cycle access from Broombridge Road, new pedestrian and cycle connections onto Broombridge Road through the western site boundary, new pedestrian connection onto the Royal Canal through the southern site boundary, a covered street providing an east-west connection through the site and continued use of the existing vehicular/pedestrian/cycle access from Boyne Road to the east; (iv) bicycle parking (192 no. visitor spaces) will be provided at surface level and a taxi area (for drop-off/pick-up) will be provided to the front of Block D; (v) all associated site and infrastructural works, including foul and surface water drainage; hard and soft landscaping, refuse stores and plant rooms, internal footpaths and roads, lighting, signage ESB substations; public and communal opens space, necessary to facilitate the development. The application is accompanies by two site layout plans, the first of which incorporates the emerging preferred route for the future Luas green line extension along the western boundary of the site, the second shows the proposed development without the future Luas route included. / 0.6 km away / 10 November 2022Refused
- 3448/22The proposed development will consist of modifications to the previously permitted build to rent residential development (permitted under Reg. Ref. 3308/20; ABP Ref. 309366-21). The proposed modifications consist of the following: (a) the provision of a new set back penthouse level at fourth floor level to Block A consisting of 4 additional apartments (4 no. 2 bedroom units) with balconies to the south elevation. Block A shall now be a 5 storey building comprising of a total of 24 no apartments (3 no. 1 bedroom units and 21 no. 2 bedroom units), (b) the provision of 2 additional floors (fifth floor and sixth floor levels) to Block B consisting of 20 no. 1 bedroom units with balconies to the south and east elevations. Block B shall be a 7 storey building comprising of a total of 69 no. apartments (68 no. 1 bedroom units and 1 no. 2 bedroom unit) with communal open space at roof level., (c) modifications to courtyard level to provide an additional 16 no. bicycle parking spaces, (d) modifications at basement level including an additional motorcycle parking space and changes to the ancillary residential amenity spaces, plant room and refuse store, (e) provision of a new community use unit at lower ground floor level/basement level, which will use the existing separate access from the eastern boundary of the application site providing access onto Bannow Road, (f) all associated site development works required to facilitate the development. The proposed development will now consist of a total of 93 no. apartments (69 no. apartments previously permitted) comprising 71 no. 1 bedroom units and 22 no. 2 bedroom units, with ancillary residential amenities and support facilities over a basement level car park and a community use unit accessed from the existing laneway to the east of the site via Bannow Road. The subject site is bonded by Bannow Road to the South, 'The Coach House' and Hamilition Square to the west, Broombridge LUAS stop and maintenance depot to the north and a gated service laneway to the east. / 0.7 km away / 28 April 2022Refused
- 2895/19The development will consist of the demolition of the existing two-storey building and associated structures on site and the construction of a residential development consisting of 32 no. apartments (1 no. studio, 11 no. 1 beds, 14 no. 2 beds, 6 no. 3 beds) in 2 no. blocks, to be provided as follows: Block A - a four storey building containing a total of 17 no. apartments comprising of 1 no. studio, 9 no. 1 beds, 5 no. 2 beds, 2 no. 3 beds with balconies to north, east and south elevations; Block B - a five storey building containing a total of 15 no. apartments comprising of 2 no. 1 beds, 9 no. 2 beds, 4 no. 3 beds with balconies to north and south elevations, a basement comprising a total of 20 no. car parking spaces, 2 no. motorcycle spaces, 76 no. bicycle parking spaces, ancillary plant room and refuse storage areas; vehicular and pedestrian access onto Bannow Road,landscaping, boundary treatment, drainage and all associated site and infrastructure works necessary to facilitate the development. / 0.7 km away / 24 June 2019Refused
- WEB1378/21A single storey porch extension to front with brick pier and roof canopy over. Part single part double storey flat roof extension to rear and associated siteworks. / 0.8 km away / 04 June 2021Refused
- WEB1801/22Erection of a 1 storey / 2 Storey extension to side/rear, new attic conversion with new dormer type window to rear/2nd floor window to front of existing dwelling to create family ancillary accommodation with internal modifications & associated site works. / 0.8 km away / 02 December 2022Refused