GrantedDecided 07 May 2021Dublin City Council

3625/20: Planning permission for development on a c. 5.3 ha site located within the existing Poolbeg Generating Station, Pigeon House Road, Dublin 4 (Eircode D04 XD82), which is licenced by the Environmental Protection Agency (EPA) under an Industrial Emissions (IE) Licence [Ref. P0577-03]. The development will consist of: (a) The demolition of three existing disused modern buildings with a combined floor area of 3,240 sq.m. comprising: (1) a single storey [up to 3.6 m high], c. 166 sq.m. Safety Centre (Pavilion) building; (2) a single storey [up to 4.5 m high], c. 463 sq. m. Store building; (3) a multi-storey [up to 20 m high], c. 2,611 sq.m. Store / Workshop building; (b) Works including: (1) remediation and cladding of exposed northern façade of 5-storey [up to 20.4 m high], redundant former Administration building; (2) cladding of exposed western façade of turbine hall building on eastern boundary of development site; (3) ancillary site clearance, grading and surfacing; (c) Construction and operation of a 75 MW capacity battery energy storage system (BESS) facility within a secured compound including the following elements: (1) Up to 24 battery container unit arrangements comprising: 24 Concrete plinths (c. 110 sq. m., c. 0.5 m high) typically supporting battery containers (c. 2.6 m high); air conditioning (A/C) unit (c. 1.8 m high); inverter unit (c. 3.8 m high); battery transformer unit (c. 3.3 m high); ring main unit (RMU) (c. 3.3 m high); (2) a c. 126 sq. m., c. 4.7 m high control building; (3) industrial/ electrical plant including: (i) 3 lightning monopoles (c. 20 m high); (ii) SCADA communication mast (c. 18 m high); (iii) VAR support unit on concrete plinth (c. 24 sq. m., c. 3.4 m high); (iv) 2 bunded house transformers (c. 19.8 sq. m., c. 3.2 m high); (v) spare parts storage container (c. 36 sq. m., c. 2.6 m high); (vi) fenced transformer compound (c. 1,309 sq. m., c. 5.6 m high); (vii) cable trays (and associated service connections); (viii) pole mounted security cameras (c. 8.3 m high); (4) Removal of existing fencing and gates, and installation of: various boundary and internal fencing and gates with different treatments including palisade specification (c. 2.6 m high), and chainlink specification (c. 2.7 m high); (5) ancillary development works including provision of areas of hardstanding, internal access roads, onsite drainage and attenuation, temporary construction laydown areas; and connections to site services networks including: telecommunications, electrical, water supply, surface water drainage/ attenuation, and ancillary cabling. The primary access will be via the existing Poolbeg Generating Station entrance at Pigeon House Road with a temporary construction access via the existing entrance off the road immediately south of the Poolbeg Generating Station. An Environmental Impact Assessment Report (EIAR) which complies with the European Union (Planning and Development) (Environmental Impact Assessment) Regulations 2018 (S.I. 296 of 2018) will be submitted to the Planning Authority with the application. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy, during office hours at the offices of the planning authority. The planning application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of Dublin City Council during its public opening hours and a submission or observation in relation to the application may be made to the Authority in writing on payment of the prescribed fee within the period of 5 weeks beginning on the date of receipt by the Authority of the application. The application may also be viewed or downloaded on the Department of Housing, Planning and Local Government's EIA Portal located at https://housinggovie.maps.arcgis.com/apps/webappviewer/index.html?id=d7d5a3d48f104ecbb206e7e5f84b71f1.

Poolbeg Generating Station, Pigeon House Road, Dublin 4
DecisionGrant permission
Decided07 May 2021
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.