GrantedDecided 15 November 2019Dublin City Council

3672/19: The proposed development will consist of external and internal amendments to a previously permitted development under DCC Reg. Ref. 3321/17. The proposed alterations include: (a) a reduction to the previous permitted basement area from 1,465 sq.m (GFA) to 962 sq.m (GFA) together with a revised layout to include a relocation of the previously permitted bicycle storeroom at ground floor level to basement level to provide 96 bicycle storage spaces at basement level; (b) reconfiguration of ground floor layout to include a reduced ESB sub-station along Mill Street (to the rear) and the introduction of an additional ESB sub-station to front onto Newmarket Square (to the front) and realigning the north-eastern corner of the building at ground floor level to provide revised layout of office reception area; relocation of bicycle storage to basement level; indoor market area, reconfiguration and regrouping of ancillary shower, changing and locker facilities together with revised layout / configuration of internal market square and artist studios; removal of permitted roof plant at first floor level and repositioning of internal eastern façade onto courtyard; (c) repositioning of northern, eastern and southern internal facades onto courtyard at second to fourth floor levels; (d) enlarged feature roof glazing element and reduction to northern terrace and reconfigure layout to wrap round the eastern corner together with an extension of permitted floorplate through a reduction of northern and eastern setback at fourth floor level; (e) provision of screened rooftop plant at fifth floor level together with an extension of the permitted office floorplate through a repositioning of the internal eastern and southern façades onto the courtyard and a reduction in the southern and eastern setbacks at fifth floor level; provision of plant at rooftop level (sixth floor level) and (f) reconfiguration of eastern core onto Mill Lane from basement to rooftop level. The proposed alterations result in associated external amendments to the permitted elevations, as follows: (i) Northern elevation - provision of screened plant at fifth floor level; relocated sub-station at ground level together with revisions to fenestration detail; increase in main parapet level at third floor from a permitted level of 31.7m to 32.21m, an increase of approximately 0.5m in height and at fourth floor level from a permitted level of 35.7m to 36.0m, an increase of approximately 0.3m in height and a reduction at fifth floor level from a permitted level of 39.8m to 39.5m, a reduction of approximately 0.3m in height. (ii) Eastern elevation - provision of terrace at 4th floor level with associated balustrading and door to terrace at fifth floor level; revised eastern core design (including the provision of a fire escape door at ground floor level) and revised proportions; screened plant at rooftop level above eastern core together with revisions to fenestration detail; increase in main parapet level at third floor from a permitted level of 31.4m to 31.5m, an increase of approximately 0.1m in height and at fourth floor level from a permitted level of 36.00m to 36.31m, an increase of approximately 0.3m in height and a reduction at fifth floor level from a permitted level of 39.8m to 39.5m, a reduction of approximately 0.3m in height. (iii) Southern Elevation - Revised stone cladding and access doors plus bicycle access and escape door added; roller shutter to car park entrance moved forward to back of footpath; basement ventilation louvres added to stone plinth; roof terrace door added at fifth floor level; screened plant at rooftop level; revisions to fenestration detail; increase in main parapet level at fourth floor level from a permitted level of 36.00m to 36.31m, an increase of approximately 0.3m in height and a reduction at fifth floor level from a permitted level of 39.8m to 39.5m, a reduction of approximately 0.3m in height. (iv) Western Elevation - provision of screened plant at rooftop levels (at fourth and fifth floor levels); revisions to internal courtyard elevations and an increase in main parapet level at third floor from a permitted level of 31.4m to 31.5m, an increase of approximately 0.1m in height and at fourth floor level from a permitted level of 36.10m to 36.28m, an increase of approximately 0.2m in height and a reduction at fifth floor level from a permitted level of 39.8m to 39.5m, a reduction of approximately 0.3m in height. The proposed amendments would result in (a) an overall increase of floorspace from an approved 9,540 sq.m (GFA) to 9,728 sq.m (GFA) - an increase of 188 sq.m (GFA); (b) an increase of 40 sq.m to the previously permitted office floorspace from 8,409 sq.m (GFA) to 8,449 sq.m, and (c) a decrease of approximately 5 sq.m (GFA) to the previously approved indoor market floorspace from 762 sq.m (GFA) to 757 sq.m (GFA) and (d) a decrease of approximately 22 sq.m (GFA) to the previously approved artist studios from 83 sq.m to 61 sq.m.

No.8 Newmarket and No.18 Mill Street, Dublin 8 (bounded by Mill Street to the south, Mill Lane to the east and Newmarket to the north)
DecisionGrant permission
Decided15 November 2019
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near No.8 Newmarket and No.18 Mill Street, Dublin 8 (bounded by Mill Street to the south, Mill Lane to the east and Newmarket to the north)?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →