3889/19: The development consists of: the proposed amalgamation of the two commercial units at 25-27 Exchequer Street and for the installation of new signage on the property and all associated works.
Basement & Ground Floor,Exchequer Chambers (part of), 25-27, Exchequer Street, Dublin 2
DecisionGrant permission
Decided24 October 2019
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Basement & Ground Floor,Exchequer Chambers (part of), 25-27, Exchequer Street, Dublin 2?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 3076/19The development will consist of: a ground floor extension of 158sqm to the existing shop, with associated changes to access and delivery area to the rear; a 92m extension of the existing restaurant first floor opening on to a roof terrace of 127 sq.m with associated new fire escape stair to rear; a new 19 sq.m prep kitchen and a roof terrace of 79sq.m second floor level and minor revisions to ancillary services, storage and circulation areas. / 0.0 km away / 12 September 2019Granted
- WEB2864/25The development will consist of the provision of a pair of decorative metal security gates at the entrance of the shop. / 0.0 km away / 03 October 2025Granted
- 3838/22The development will consist of (1) Internal alterations and refurbishment of ground floor entrance lobby situated on Exchequer Street; (2) Internal alterations and refurbishment of first, second and third floor office accommodation as well as an entrance and stairs at ground floor level; (3) Change of use of 131.65 sq. m of first floor accommodation from office to hair salon including an additional 9.1 sq.m resulting from the removal of a stair; (4) The removal of an existing staircase to the rear south east corner and the extension of the existing office floors at second and third floors by 9.1 sq. m per floor; (5) External repairs to brickwork including, cleaning replacing spalled brickwork, re-pointing of brickwork to front, rear and side elevations, repair chimneys as necessary with existing finishes reinstated, cleaning and repairs to existing sandstone courses to Exchequer St. and Drury St. installation of 4 no. fire-rated glazed panels to the external face of the existing window to rear staircase within the common corridor, replacement of existing window to the rear-staircase on the west at flat roof level with new roof-access-door, formation of new opening in existing rear staircase on the east at flat roof level to accept new roof-access-door, replacement of lead flashings and parapet gutters, dormer linings and recovering the existing main roof with reused and replacement natural slate with 4 no. rooflights installed to rear; (6) Refurbishment of existing window sashes and replacement of glazing with double-glazed units; (7) Replacement cast-iron rainwater goods to Exchequer Street elevation and pvc rainwater goods to rear (south) elevation (8) Removal of existing flagpoles and decommissioned alarm boxes; (9) Replacement of SVPs with new to rear (south) elevation; (10) Installation of 4 no. vent grilles in brickwork to the rear (south) facade and 3 no. ventilation grilles in brickwork to the east facade and installation of 2 no. ventilation grilles in the roof to the south (11) Removal of existing roller shutter and replacement with new hardwood painted door to the front entrance on Exchequer Street; (12) Replacement of existing building signage above entrance door with new signage in same location and new 'plaque' signage to right-hand side of entrance door; (13) Installation of mechanical plant and screening to the flat roof area at first floor level at rear; (14) All other associated structural, fire compartmentation works and service installations. / 0.0 km away / 20 June 2022Granted
- WEB1601/20Permission for the erection of 2nos. advertising structures, within curtilage and affixed to the hotel development at 09-17 St. Andrew's Lane, Dublin 2; covered by existing granted Planning Permission (Reg. Ref. 4342/16 and 2537/19). The Planning Permission (Reg. Ref.4342/16) had previously indicated the location of these advertising structures; 1no. to the west of the development at Ground Level (0.6msq) and 1no. to the North of the Development at 5550mm above external Ground Level (2.6msq). The signage lettering will be a mirror black stainless steel finish. On the north, the lettering will be back lit and supported off a satin black powder coated aluminium frame. To the west, the lettering will be supported through a glazed balustrade. / 0.0 km away / 27 October 2020Granted
- 3252/23PROTECTED STRUCTURE: (REF: 2725). The development will consist of the removal of the current Exchequer Street and Drury Street shopfronts as per the planning drawings to reinstate the surviving historic elements of the original shopfront with the new shopfront including the relocation of the door to the corner elevation. The proposed shopfront will incorporate surviving elements of the historic brick/terracotta or timber elements of the shopfront which should be faithfully accurate to the original features including new advertisement signage and all associated works. / 0.0 km away / 18 April 2023Granted
- WEB1954/232 No. new fascia signs and 2No. new Bus stop signs to existing shopfronts of 32&34 Exchequer Street. / 0.0 km away / 03 January 2024Granted
- 4787/19PERMISSION & RETENTION: Retention planning permission is sought for (i) ventilation ducts to the rear elevation to serve the kitchen; and; (ii) plant and associated ducts located to the rear of the second floor roof of the previously approved extension to serve the Nando's restaurant. Planning permission was previously granted for alterations to the building to provide a Nando's restaurant under Reg. Ref. 2013/11. Planning permission is also sought for a new water harvesting system, including the installation of water tanks (1 no. 1m3 tank at basement level and 2 no. 2.5m3 tanks at third floor level), and the installation of a non-return valve at basement level. The development also includes any ancillary works necessary to facilitate the development. / 0.0 km away / 21 February 2020Granted
- 2230/19Permission at No. 5-6 Dame Court and part of No. 2-4 Dame Court (Hely Building), Dublin 2 for development. The proposed development comprises a change of use of 2.321 sqm (GFA) from Telephone Exchange to office use at part ground floor level and all upper levels (first to fifth floor levels) together with the complete refurbishment of the building, including internal and external alterations. Proposed internal alterations include: (a) the removal and rearrangement of partitions throughout the building at part ground to fifth floor level to provide revised internal floor layouts, including revised office entrance / lobby / reception, lift / stair and services core, staff facilities (shower and changing rooms) and ancillary cafeteria and breakout spaces; (b) formation of a new stairway access from ground floor of No. 5-6 Dame Court to the basement of No. 2-4 Dame Court (Hely Building) and revised layout to basement below the Hely building together with the relocation of the existing ground floor link to the Hely building; (c) blocking of existing interlinking doorways at first to fourth floor level between No. 5-6 Dame Court and No. 2-4 Dame Court (Hely Building). Proposed external alterations include: (a) the provision of a new pedestrian / cycle gate adjoining the existing Eir car park entrance off St. Andrew's Lane; (b) provision of 50 no. sheltered bicycle storage spaces and a new external fire escape to the rear of No. 5-6 Dame Court; (c) provision of new office entrance off Dame Court and the comprehensive refurbishment of the building at No. 5-6 Dame Court through revised elevational design and treatment of all elevations; (d) provision of additional / new rooftop plant at fifth floor level together with the removal of existing plant screen and the provision of new plant screen to perimeter of roof at fifth floor level; and (e) provision of new drainage infrastructure (including sub-surface attenuation tank to rear park and sub-surface rainwater harvest tank and greywater recycling system along Dame Court) together with all associated site works. / 0.0 km away / 05 July 2019Granted