D02A/0904: The development consists of a new two storey
Mount Carmel hospital, Braemor Road, Dublin 14.
DecisionGrant permission
Decided29 October 2002
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Mount Carmel hospital, Braemor Road, Dublin 14.?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- D07A/0270Alterations to Reg. Ref. D02A/0904 consisting of revised colour and location of / 0.0 km away / 25 April 2007Granted
- D06A/0904Erection of a single storey split level link / 0.0 km away / 17 August 2006Granted
- D06A/0333The development will consist of demolition of (301 sq.m.) south west / 0.0 km away / 28 April 2006Granted
- D25A/0685/WEBThe development will consist of: the provision of 2 no. adjoining, partially enclosed storage areas to accommodate a new VIE oxygen gas tank (c. 6.77m high and c. 1.62m in diameter), panel area, gas bottle store and all associated fittings and connections. The adjoining partially enclosed storage areas will be situated on a new concrete plinth with ramped access and a c. 2.6m high concrete wall along the west façade and a c. 2.6m high wire mesh fence and associated gates along the north, east and south facades. The southern partially enclosed storage area will include a lean-to corrugated roof (c. 3.0m at its highest point) while the northern partially enclosed storage area will remain open. The development will also include the provision of new concrete hardstanding surface to accommodate supply truck; and associated site clearance including removal of 1 no. tree, and all associated site works. / 0.0 km away / 28 October 2025Granted
- D05A/1365The development will consist of erection of new single / 0.1 km away / 08 December 2005Granted
- D03A/0559Demolition of existing laundry, generator room and associated out buildings, and / 0.1 km away / 10 October 2003Granted
- D21A/0238Permission for development. The development will consist of / 0.1 km away / 17 May 2021Granted
- D06A/1850Demolition of 3storey bedroom block and a 2storey physio and Lab block / 0.1 km away / 20 June 2007Granted