D19A/0457: Permission for development. The proposal consists of the construction of 3 no. office buildings ('N1'; 'N2' and 'N3') ranging in height from 6 to 8 storeys, over lower ground floor and basement level. The total GFA of office floorspace proposed is c.47,216 sq.m. The proposal includes plant areas at basement, lower ground and roof level. The proposal includes a wellness pavilion building (GFA of c. 148 sq.m), public open space, sunken gardens, shared entrance plaza, upper level / roof terraces to buildings and all associated works. The proposal includes 474 no. car parking spaces at basement and lower ground floor level. 474 no. cycle parking spaces are proposed at lower ground and surface level. The associated site and infrastructural works include site access and internal roads, entrance ramp to car park, cycle path, footpaths, 4 no. ESB substations, bin stores, plant rooms, foul water drainage, surface water drainage including attenuation tank watermains including water storage tank, utilities, hard and soft landscaping, public lighting, boundary treatments and all ancillary works on an application site area of c. 1.97 hectares.
Central Park (Block N Site), Leopardstown Road, Dublin 18
DecisionGrant permission
Decided21 January 2020
Application typePermission
Source documents22
Site
What is on file
0refusal reasons50conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dún Laoghaire–Rathdown is in progress.
Conditions
- 1Development per lodged plans and FI submissions.Compliance
- 2Buildings not occupied until Sandyford Tank Sewer project commissioned or agreed with Irish Water.Occupancy
- 3Wellness Pavilion signage agreed prior to occupation. Pavilion open to public.Design Materials
- 4No advertising signs without prior permission.Other
- 5Hard/soft landscape details agreed prior to commencement. Play/open space boundaries maintained as open access. Wildflower meadow as conditioned open space.Landscaping Boundary
- 6Play equipment details conform to EN 1176-1-11, EN 1177, BS/EN 2017/18.Landscaping Boundary
- 7Internal roads/footpaths/lighting to meet DLRCC 'Taking-in-Charge' requirements.Traffic Access
- 8Appoint Landscape Architect/Designer. Practical Completion Certificate signed by consultant.Landscaping Boundary
- 9Implement measures from submitted Quality Audit drawings.Traffic Access
- 10Continuous dished footpath in front of ESB substation. Gates open inwards.Traffic Access
- 11Submit details of cover for visitor cycle parking.Traffic Access
- 12Submit details demonstrating pedestrian-only access for pathways in front of Block N2.Traffic Access
Planning a project near Central Park (Block N Site), Leopardstown Road, Dublin 18?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Planners ReportSource: planningapi.agileapplications.ie / KOD02CUO.PDF / Document 681375Source PDF
- Planners ReportSource: planningapi.agileapplications.ie / KOD02941.PDF / Document 681444Source PDF
- Planners ReportSource: planningapi.agileapplications.ie / KOD02JZT.PDF / Document 681704Source PDF
- ReportsSource: planningapi.agileapplications.ie / ZY100000YFQ.pdf / Document 1513024Source PDF
- ReportsSource: planningapi.agileapplications.ie / ZY100000YHL.pdf / Document 1513048Source PDF
- ReportsSource: planningapi.agileapplications.ie / ZY100000YKO.pdf / Document 1513053Source PDF
- ReportsSource: planningapi.agileapplications.ie / ZY100000YLS.pdf / Document 1513054Source PDF
- ReportsSource: planningapi.agileapplications.ie / ZY100000YN2.pdf / Document 1513056Source PDF
- ReportsSource: planningapi.agileapplications.ie / ZY100000YNC.pdf / Document 1513057Source PDF
- ReportsSource: planningapi.agileapplications.ie / ZY100000YNU.pdf / Document 1513058Source PDF
- ReportsSource: planningapi.agileapplications.ie / ZY100000YOC.pdf / Document 1513059Source PDF
- ReportsSource: planningapi.agileapplications.ie / ZY100000YPE.pdf / Document 1513060Source PDF
- ReportsSource: planningapi.agileapplications.ie / ZY100000YSB.pdf / Document 1513061Source PDF
- ReportsSource: planningapi.agileapplications.ie / ZY100000YFU.pdf / Document 1513210Source PDF
- ReportsSource: planningapi.agileapplications.ie / ZY100000YVC.pdf / Document 1513213Source PDF
- ReportsSource: planningapi.agileapplications.ie / ZY100000YWH.pdf / Document 1513215Source PDF
- ReportsSource: planningapi.agileapplications.ie / ZY100000YQG.pdf / Document 1513242Source PDF
- ReportsSource: planningapi.agileapplications.ie / ZY100000YVY.pdf / Document 1513244Source PDF
- ReportsSource: planningapi.agileapplications.ie / ZY100000YSW.pdf / Document 1514398Source PDF
- ReportsSource: planningapi.agileapplications.ie / KOD02I3I.PDF / Document 672489Source PDF
- ReportsSource: planningapi.agileapplications.ie / KOD02CVL.PDF / Document 681416Source PDF
- ReportsSource: planningapi.agileapplications.ie / KOD02K1T.PDF / Document 681551Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- D19A/0457/EPermission for development. The proposal consists of the construction of 3 no. office buildings ('N1'; 'N2' and 'N3') ranging in height from 6 to 8 storeys, over lower ground floor and basement level. The total GFA of office floorspace proposed is c.47,216 sq.m. The proposal includes plant areas at basement, lower ground and roof level. The proposal includes a wellness pavilion building (GFA of c. 148 sq.m), public open space, sunken gardens, shared entrance plaza, upper level / roof terraces to buildings and all associated works. The proposal includes 474 no. car parking spaces at basement and lower ground floor level. 474 no. cycle parking spaces are proposed at lower ground and surface level. The associated site and infrastructural works include site access and internal roads, entrance ramp to car park, cycle path, footpaths, 4 no. ESB substations, bin stores, plant rooms, foul water drainage, surface water drainage including attenuation tank watermains including water storage tank, utilities, hard and soft landscaping, public lighting, boundary treatments and all ancillary works on an application site area of c. 1.97 hectares. / 0.0 km away / 17 July 2025Granted
- D07A/1626Transfer of the existing 150 sq.m. temporary creche building to a new site withi / 0.1 km away / 30 January 2008Granted
- D05A/1137110 kV electrical transformer station / 0.1 km away / 26 October 2005Granted
- D16A/0159Permission: Block 1 as permitted under Reg. Ref. D98A/0886 is a 7,639 sqm / 0.1 km away / 14 October 2016Granted
- D08A/0421The renewal of planning permission for a two storey portacabin building for use / 0.1 km away / 06 June 2008Granted
- D09A/0398Planning permission sought for development which will consist of the installatio / 0.1 km away / 16 September 2009Granted
- D15A/0370Permission: Block K was permitted under Reg. Ref. D04A/0994. The proposed / 0.1 km away / 24 July 2015Granted
- D15A/0369Permission: Block K was permitted under Reg. Ref. D04A/0994. The proposed / 0.1 km away / 23 July 2015Granted