F03A/1162/E3: Construction of 478 residential units, comprising 35 no. 4 be
In townlands of Stapolin and Baldoyle, Co Dublin.
DecisionGrant extension of duration of perm.
Decided07 October 2014
Application typeExtension Of Duration Of Permission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F15A/0074Modifications to 205 residentail units previoulsy permitted under An B / 0.1 km away / 22 May 2015Granted
- F19A/0574Retention permission for the partial conversion of the existing attic (western area) into a storage area (41.7sq.m.), 2 new rooflights to the rear and 2 to the front (1 as a smoke vent over stairwell and 1 for toilet). / 0.1 km away / 31 January 2020Granted
- F23A/0611The area subject of this planning application is located at the existing foul pumping/ lifting station (which was constructed under(FO2A/0921 & PL06F.201400) and the permitted Haggard Park (as permitted under F16A/0412, ABP Re. Ref.: PL06F.2485970 as amended under F20A/0258, F21A/0046 and F22A/0017). The proposed development includes for: Construction of a new, upgraded wastewater pumping station (WWPS) to include extension of the existing access road, coordinated with landscaping design, to allow set down area; an underground wastewater pumping station, with a wet well arrangement; an underground emergency storage tank, with approx. capacity 790m3; extension of the existing gravity networks to new WWPS; vent stack of c. 6m in height and hand operated penstock; valve and flowmeter chambers; a new rising main (to be confirmed based on condition survey); standoff manhole and control and washdown kiosks. The proposed development works also includes all the necessary diversion of the existing utilities, power supply and water connection for the new WWPS. Decommissioning of the existing pump station to include demolition and removal of the existing wastewater pumping station buildings, removal of all associated pump equipment and infrastructure, and removal of associated hard works e.g., footpath, access yard, walls and fences. Temporary works and all associated above and below ground site works including underground ducting, landscaping, lighting, site development works and boundary treatments. A Natura Impact Statement has been prepared in respect of the proposed development. / 0.1 km away / 04 December 2023Granted
- F16A/0391Modifications to the existing two storey vacant retail unit. Unit 1 a / 0.2 km away / 22 December 2016Granted
- F16B/0143A first floor extension (21 m.sq.), over the original single storey ga / 0.2 km away / 05 September 2016Granted
- F15B/0199Converting the attic space for home office use to include dormer to re / 0.2 km away / 13 October 2015Granted
- F15B/0200Converting the attic space for home office use to include dormer to re / 0.2 km away / 13 October 2015Granted
- F22A/0272Two storey pitched roof extension to side over existing garage. Single storey pitched and flat roof extension to the rear. Retention of existing non habitable attic conversion along with additional rooflights proposed to front roof slope. Associated internal modification & site works. / 0.2 km away / 11 July 2022Granted