F23A/0611: The area subject of this planning application is located at the existing foul pumping/ lifting station (which was constructed under(FO2A/0921 & PL06F.201400) and the permitted Haggard Park (as permitted under F16A/0412, ABP Re. Ref.: PL06F.2485970 as amended under F20A/0258, F21A/0046 and F22A/0017). The proposed development includes for: Construction of a new, upgraded wastewater pumping station (WWPS) to include extension of the existing access road, coordinated with landscaping design, to allow set down area; an underground wastewater pumping station, with a wet well arrangement; an underground emergency storage tank, with approx. capacity 790m3; extension of the existing gravity networks to new WWPS; vent stack of c. 6m in height and hand operated penstock; valve and flowmeter chambers; a new rising main (to be confirmed based on condition survey); standoff manhole and control and washdown kiosks. The proposed development works also includes all the necessary diversion of the existing utilities, power supply and water connection for the new WWPS. Decommissioning of the existing pump station to include demolition and removal of the existing wastewater pumping station buildings, removal of all associated pump equipment and infrastructure, and removal of associated hard works e.g., footpath, access yard, walls and fences. Temporary works and all associated above and below ground site works including underground ducting, landscaping, lighting, site development works and boundary treatments. A Natura Impact Statement has been prepared in respect of the proposed development.
Lands at Baldoyle (Formerly known as the Coast), Dublin 13
DecisionGrant permission
Decided04 December 2023
Application typePermission
Source documents5
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Chief Executives OrderSource: planningapi.agileapplications.ie / F23A_0611_CE.pdf / Document 897456Source PDF
- Final GrantSource: planningapi.agileapplications.ie / F23A_0611.pdf / Document 904263Source PDF
- ReportsSource: planningapi.agileapplications.ie / F23A_-_0611_Water_Services.pdf / Document 893883Source PDF
- ReportsSource: planningapi.agileapplications.ie / F23A-0611_-_UE.pdf / Document 894295Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- F03A/1162/E3Construction of 478 residential units, comprising 35 no. 4 be / 0.1 km away / 07 October 2014Granted
- F19A/0574Retention permission for the partial conversion of the existing attic (western area) into a storage area (41.7sq.m.), 2 new rooflights to the rear and 2 to the front (1 as a smoke vent over stairwell and 1 for toilet). / 0.2 km away / 31 January 2020Granted
- F15A/0074Modifications to 205 residentail units previoulsy permitted under An B / 0.2 km away / 22 May 2015Granted
- LRD0073/S3EThe Land Development Agency, intend to apply for permission for a Large-scale Residential Development (LRD) for lands at Baldoyle (formerly known as The Coast), Dublin 13. The site is bounded to the north by undeveloped lands, to the east by residential development of Red Arches Drive, to the south by residential development of Red Arches Road and to the west by undeveloped land, with the Dublin-Belfast railway line further beyond. The proposed development will consist of amendments to Zone B of GA01 lands as permitted under ABP Reg. Ref. ABP-310418-21 / FCC Reg. Ref. SHD/011/20. This will involve the amendment of permitted house units (the 2 no. eastern most units in Block B3 and 4 no. eastern most units in Block B4) to reconcile with as the built condition. This includes the omission of 2 no. 3-bed housing unit, the alteration of 1. no 3-bed unit to a 2 bed-unit and the increase in rear garden and provision of rear access for 1 no. unit. This results in the overall loss of 2 units. There are no amendments to the rear gardens or constructed boundaries of the adjacent units on Stapolin Avenue. A Natura Impact Statement has been prepared in respect of the proposed development. The application may also be inspected online at the following website set up by the applicant: www. StapolinAmendment1LRD.ie Additional Information received 17th October 2025 Revised Public Notices received 28th October 2025. / 0.2 km away / 11 December 2025Granted
- F16A/0391Modifications to the existing two storey vacant retail unit. Unit 1 a / 0.2 km away / 22 December 2016Granted
- LRD0007/S3A Large-scale Residential Development (LRD) for lands at Baldoyle (formerly known as The Coast), Dublin 13. The site is bounded to the north by undeveloped lands, to the east by residential development of Red Arches Drive, to the south by residential development of Red Arches Road and to the west by undeveloped land, with the Dublin-Belfast railway line further beyond. The proposed development will consist of amendments to Block B as permitted under FCC Reg. Ref. F16A/0412 (ABP Reg. Ref. PL06F.248970) and amended under FCC Reg. Ref. F20A/0258, F21A/0046 and F22A/0017. The proposed amendments will consist of: • The reconfiguration of permitted units omitting 28 no. apartments as permitted under F16A/0412 (as amended) and the addition of 26 no. houses resulting in the provision of 88 no. apartments (3-5 storey) and 54 no. houses (2-3 storey). This results in an overall total of 142 no. units, an overall reduction of 2 no. units on that permitted; • The reconfiguration of the internal road layout as permitted under F16A/0412 (as amended); • The removal of permitted basement below Blocks B1 and B2 and the provision of 170 no. car parking spaces and 262 no. cycle spaces at ground floor and surface; and • The development of a linear park along Longfield Road. The proposed development will also include for all associated landscaping works and site development works above and below ground. A Natura Impact Statement has been prepared in respect of the proposed development. The application may also be inspected online at the following website set up by the applicant: shorelineblockblrd.ie The Planning Application, including the Natura Impact Statement, may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority during its public opening hours. Fingal County Council, County Hall, Main Street, Swords, Co. Dublin (to inspect Planning Applications on all lands). Opening Hours 9.30 - 16.30 Monday - Friday. (Cash Office opening hours are 9.30 to 15.30 p.m.). A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee (€20.00) within the period of 5 weeks beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions, or may refuse to grant permission. / 0.3 km away / 20 January 2023Granted
- F16A/0412550 no. residential units (379 no. apartments and 171 no. houses) / 0.3 km away / 07 July 2017Granted
- F15B/0200Converting the attic space for home office use to include dormer to re / 0.3 km away / 13 October 2015Granted