F07A/1579/E1: The development will consist of an industrial development comprising 8
Phase 2 Roseville Business Park, Turvey, Donabate, Co. Dublin
DecisionGrant extension of duration of perm.
Decided29 July 2013
Application typeExtension Of Duration Of Permission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Phase 2 Roseville Business Park, Turvey, Donabate, Co. Dublin?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F24A/0295E1) Alterations and Single Storey Extension to side of existing Industrial Unit by 91sqm, 6450mm High at High Point and 5852mm at Eaves Level, together with All Ancillary Works. / 0.0 km away / 22 May 2024Granted
- F12A/0410A temporary planning permission for a period of 5 years for open stora / 0.1 km away / 27 March 2013Granted
- F17A/0562A temporary Planning Permission for a further period of 5 years (as an / 0.1 km away / 07 November 2017Granted
- F11A/0284Temporary planning permission for a period of 3 years for casual tradi / 0.1 km away / 27 October 2011Granted
- F11A/0250Construction of a single storey double height extension to side of exi / 0.1 km away / 05 March 2012Granted
- F21A/0062Permission for a small-scale Waste Electrical and Electronic Equipment (WEEE) and Battery Storage and Transfer Facility, The applicant intends on accepting WEEE and Battery waste from permitted operators at this facility for temporary storage in UN approved containers prior to onward dispatch to authorised WEEE and Battery waste treatment facilities. The applicant intends on accepting a maximum of 520 tonnes of WEEE and Battery waste on-site per annum. A maximum of 20 tonnes of WEEE/Battery will be stored on-site at any one point in time. No on-site processing or treatment of WEEE/Battery waste will be undertaken at this facility. A Waste Facility Permit is required for the proposed activity under Classes 1 and 9 of Part 1 of the Third Schedule of the Waste Management (Facility Permit & Registration) Regulations 2007, as amended. The applicant intends on obtaining such a Waste Facility Permit. AI received 27/07/21 / 0.2 km away / 19 August 2021Granted
- F11A/0251Provision of a secure vehicle compound for 281 cars (previously approv / 0.2 km away / 19 August 2011Granted
- F19A/0011First floor office space at an existing warehouse unit. / 0.2 km away / 04 March 2019Granted