F11A/0250: Construction of a single storey double height extension to side of exi
'Gannon's City Recovery', Roseville Industrial Estate, Turvey Avenue,
DecisionGrant permission
Decided05 March 2012
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 'Gannon's City Recovery', Roseville Industrial Estate, Turvey Avenue,?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F11A/0251Provision of a secure vehicle compound for 281 cars (previously approv / 0.1 km away / 19 August 2011Granted
- F24A/0295E1) Alterations and Single Storey Extension to side of existing Industrial Unit by 91sqm, 6450mm High at High Point and 5852mm at Eaves Level, together with All Ancillary Works. / 0.1 km away / 22 May 2024Granted
- F19A/0011First floor office space at an existing warehouse unit. / 0.1 km away / 04 March 2019Granted
- F21A/0062Permission for a small-scale Waste Electrical and Electronic Equipment (WEEE) and Battery Storage and Transfer Facility, The applicant intends on accepting WEEE and Battery waste from permitted operators at this facility for temporary storage in UN approved containers prior to onward dispatch to authorised WEEE and Battery waste treatment facilities. The applicant intends on accepting a maximum of 520 tonnes of WEEE and Battery waste on-site per annum. A maximum of 20 tonnes of WEEE/Battery will be stored on-site at any one point in time. No on-site processing or treatment of WEEE/Battery waste will be undertaken at this facility. A Waste Facility Permit is required for the proposed activity under Classes 1 and 9 of Part 1 of the Third Schedule of the Waste Management (Facility Permit & Registration) Regulations 2007, as amended. The applicant intends on obtaining such a Waste Facility Permit. AI received 27/07/21 / 0.1 km away / 19 August 2021Granted
- F07A/1579/E1The development will consist of an industrial development comprising 8 / 0.1 km away / 29 July 2013Granted
- F25A/0461EThe development will consist of a prefabricated lightweight metal frame single-storey workshop building (600sq.m) along with rainwater harvesting. / 0.2 km away / 16 July 2025Granted
- F12A/0410A temporary planning permission for a period of 5 years for open stora / 0.2 km away / 27 March 2013Granted
- F17A/0562A temporary Planning Permission for a further period of 5 years (as an / 0.2 km away / 07 November 2017Granted