F11A/0146: The erection of 4 no. 18.5 metre high floodlights to the existing main
Skerries Town Football Club, Park Lane, Skerries, Co Dublin
DecisionGrant permission
Decided07 June 2011
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F11A/0413Erection of ball stop netting around the existing pitch area; height t / 0.0 km away / 13 January 2012Granted
- F26A/0175ERetention Permission is sought for a single-storey rear extension to Kitchen/Dining Room and all associated siteworks. / 0.0 km away / 05 May 2026Granted
- F15A/0178Erection of a new 6m. high x 12m. long concrete hurling/ball wall with / 0.0 km away / 17 June 2015Granted
- F18A/0208The construction of a new 21 metre high monopole structure with teleco / 0.0 km away / 19 June 2018Granted
- F25A/0906EPermission for a link footpath and pedestrian gate to provide a Part M compliant access route between Skerries Community College and Skerries Harps GAA Club grounds and facility. / 0.1 km away / 24 November 2025Granted
- F16A/0378Demolition of single storey dwelling, construction of a new part singl / 0.1 km away / 24 October 2016Granted
- F19B/0159For single storey extension to rear of existing dwelling. / 0.1 km away / 06 August 2019Granted
- F20A/0610Construction of a two-storey detached dwelling, a car port and upgraded vehicular access point to include a c.15 metres long kerb build-out on Balbriggan Street to the east of the access point. The kerb build-out shall measure a maximum of 0.7 metres wide, with the footpath along the entire length of the kerb build-out reconstructed to accommodate its installation. 5 no. bollards are to be provided on the kerb build-out and 15 metres of new double yellow lines shall be installed on the southern carriageway adjacent to the kerb build=-out to control unauthorised parking of vehicles. The centre line of Balbriggan Street shall be locally realigned over a distance of ca. 41 metres in the kerb build-out's vicinity and all associated ancillary site development works necessary to facilitate the development. / 0.1 km away / 27 January 2021Granted