F11A/0333: The installation of 13 no. banner advertisement signs. The proposed b
Terminal 2 Forecourt And, Corballis Road South, Dublin Airport, Co Dub
DecisionGrant permission
Decided27 October 2011
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Terminal 2 Forecourt And, Corballis Road South, Dublin Airport, Co Dub?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F22A/0316The installation of the Thermal Storage tank permitted under Planning Reg Ref. F19A/0084 at a revised location to the east of the Terminal 2 Energy Centre, along with all associated site works including the erection of a new boundary fence around the Thermal Storage Tank. The tanks dimensions (16m x 4.8 m) and capacity (250m3) will remain unchanged. It will, as previously permitted, be used to store excess heat and improve the energy efficiency of the existing combined Heat and Power Plant serving Terminal 2. / 0.1 km away / 17 August 2022Granted
- F21A/0518Planning permission for development which will consist of alterations to section of the existing internal road network and associated works, on the Departures routes to and from the Terminal 1 and Terminal 2 forecourts in the townlands of Corballis and Collinstown, Dublin Airport, Co. Dublin. The proposed development will include the reconfiguration of the 2no. existing exit lanes from both the Terminal 1 and Terminal 2 forecourts to provide 4no. new exit lanes, and all associated works including pay cabinets, staff control reader, control barrier, flexi bollards, automatic number plate recognition cameras, CCTV cameras, and 2no. cantilever columns with lane guidance signage, new fencing, new kerbs, new/realigned footpaths and cycleways, relocated lighting columns, and traffic islands. The proposed reconfigured exit lanes from the Terminal 1 and 2 forecourts will also have 1no. lane for buses and taxis. The proposed reconfigured exit lanes from the Terminal 1 forecourt will have 1no. lane including control barriers for emergency vehicles only. The proposed reconfigured exit lanes from the Terminal 2 forecourt will also involve the closure of the existing access/egress into the existing Terminal 2 short-term surface car park and the provision of a new access and new egress, barrier, a CCTV camera and pay cabinet; a proposed concrete median to tie into the existing median; the internal rearrangement and change of use of the existing Terminal 2 surface car park (291no. spaces) to provide 245no. long-term car parking spaces, 17no. van parking spaces, and 20no. short-term car parking spaces; and the removal of an existing pedestrian crossing and provision of a new pedestrian crossing. The proposed development will also involve the erection of advance traffic direction, fee information signage and road markings, and all associated site development, drainage and landscaping works. the proposed development will also involve the reconfiguration of the existing car parking layout on part of the central section of the Express Red Long-Term Car Park in the townland of Toberbunny, Dublin Airport, co. Dublin including the removal of 206no. long-term car parking spaces; the provision of a proposed entry lane, pay cabinet, bollards, entry barrier, automatic number plate recognition camera, staff control reader, and CCTV camera; relocated security hut; provision of new egress with a proposed exit barrier, CCTV camera and pay cabinet; and all associated site development, landscaping and fencing works, to facilitate a time-limited free waiting zone incorporating 100no. short-term car parking spaces (including 4no. PRM waiting spaces). AI received 20/12/21 CAI Received 04/02/2022 / 0.1 km away / 03 March 2022Granted
- F14A/0435Modifications to existing administration building with proposed new en / 0.1 km away / 15 December 2014Granted
- F21A/0706An amendment to Planning Permission reference F19A/0084 as granted in respect of a new Thermal Storage Tank and all associated site works. The development will consist of: Replacement of the permitted single 250m3 horizontal storage vessel with 3 no. 80m3 vertical Thermal Storage Tanks arranged in series connection and all associated site works on a site of 418.68 sq.m. The tanks will measure 8m high by 3.8m diameter and have a combined capacity of 240m3 for the storage of hot water. They will be used to store excess heat and improve the energy efficiency of the existing Combined Heat and Power Plant serving Terminal 2. / 0.1 km away / 24 February 2022Granted
- F19A/0084Permission for development at 418.68 sq.m site. The development will c / 0.1 km away / 15 April 2019Granted
- F24A/0160DAA proposes the installation of / 0.1 km away / 23 April 2024Granted
- F21A/0594Permission for continuation of use of the existing site office structure at "The Green", Dublin Airport Central, Dublin Airport, Swords, Co Dublin, K67 X4X5. The application seeks permission for the continuation of the existing use of the structure as a Covid Testing Centre for a period of up to 3 years. / 0.2 km away / 04 January 2022Granted
- F23A/0707Permission to amend a previous permitted development (Fingal County Council reg ref F21A/0255) located at Dublin Airport. The development proposed under the subject application relates specifically to Site A - Hotel Site. The development permitted on Site B, Site C and Site D is unaffected by this planning application. The proposed development, which provides for alterations to the permitted hotel development, comprises: the reconfiguration of the internal layout of all Levels of the permitted building (from Ground to Eleventh Floor Levels), to include amendments to the hotel bedrooms and related ancillary hotel facilities including entrance lobbies and reception spaces, meeting rooms, event / business space (with ancillary related spaces and public bar), administration, security office and staff facilities, restaurant with bar (and ancillary related spaces), leisure centre (including reception area and related facilities such as changing rooms, gym, treatment rooms, sauna, steam room and vitality room), toilets, waste storage area, bicycle store, ancillary space (which includes areas such as circulation cores (lifts and stairs) and routes, plant areas and storage areas throughout the building, electrical substations and switchrooms, toilets and shower areas etc.), and the omission of the permitted children's play room (kids club) and private dining area alterations to the Eleventh Floor Level's public bar's and executive lounge's south facing terrace; an increase in the size of the permitted retail unit by 9 sq m - from c. 188 sq m permitted to c. 197 sq m proposed); alterations to the permitted building's elevations; alterations to the permitted plant areas at Eleventh Floor Level and at Roof Level (and associated relocation of the roof plant screen, where required), including the relocation of the permitted weather radome and associated equipment room at Roof Level; and associated alterations to permitted hard and soft landscaping and permitted scheme's site services (mechanical and electrical, water supply, sewage disposal and surface water disposal), all on a proposed larger site area of 0.4859 for Site A (0.4715 ha permitted). The development also consists of the provision of a dedicated covered one-way service route to the rear of the permitted building at Ground floor Level, with associated automatic security roller shutters, intercom pillar and service area. Service route and yard access will be via the existing Terminal 2 Multi Storey Car Park access road, with egress will be via the Terminal 2 Multi Storey Car Park exit road in the west. The permitted designated drop-off / layby at the front of the hotel continues to be provided. The proposed development results in an increase in the permitted building's height (excluding weather radome) (from c. 41.5m permitted to c. 41.8m proposed) and alterations to the permitted extents of the building floorplates. The proposed development also results in an increase in the gross floor area of the permitted Ground, Second and Eleventh Floor Levels by c. 353 sq m in total (from c. 6,804 sq m floor area total permitted across these levels, to c. 7,157 sa m floor area total proposed across these levels), and a decrease in the size of the permitted First Floor Level by c. 5 sq m gross floor area (from c. 3,101 sq m floor area total permitted, to c. 3,096 sa m floor area total proposed) (there is no change proposed to the permitted gross floor areas of the Third, Fourth, Fifth, Sixth, Seventh, Eighth, Ninth and Tenth Floor Levels (c. 2,384 sq m floor area for each level or c. 18,784 sq m in total permitted)). The total gross floor area of the hotel building increases by c. 348 sq m (from c. 28,689 sq m permitted to c. 29,037 sq m proposed) with an increase in the number of hotel bedrooms from 410 No. permitted to 412 No. proposed.;Site B - Skybridge House (former TASC Building), Dublin Airport, townland of Collinstown, Co. Dublin; Site C - Site Compound 1 is bounded by the T2 Departure Road to the west and T2 Multi-storey Car Park to the east, Dublin Airport, townland of Corballis, Co. Dublin; and Site D - Site Compound 2 is located to the east of Swords Rugby Club in the townland of Stockhole, Co. Dublin. / 0.2 km away / 23 January 2024Granted