F24A/0160: DAA proposes the installation of
Terminal 2 (Adjacent to), Dublin Airport, Corballis, Co. Dublin
DecisionGrant permission
Decided23 April 2024
Application typePermission
Source documents7
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / F24A_0160_D.pdf / Document 1030122Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / F24A_0160_CE.pdf / Document 1030121Source PDF
- Final GrantSource: planningapi.agileapplications.ie / F24A_0160_FG.pdf / Document 1036400Source PDF
- ReportsSource: planningapi.agileapplications.ie / F24A-0160_-_ApasTemplate.docx / Document 1026911Source PDF
- ReportsSource: planningapi.agileapplications.ie / F24A_-_0160_Daa.pdf / Document 1026963Source PDF
- ReportsSource: planningapi.agileapplications.ie / F24A_-_0160_TII.pdf / Document 962293Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- F16A/0081The provision of apron bus access facilities at Terminal 2, comprising / 0.1 km away / 30 June 2016Granted
- F24A/0965EThe provision of apron bus access facilities at Terminal 2, comprising the construction of a vertical circulation core (10.95m high) to the south of Terminal 2 (airside), linking to Terminal 2 via a glazed passenger bridge. The development will also include minor road re-alignment works, the provision of a bus set-down area to the east of the vertical circulation core, a covered walkway and all ancillary development, site works and services on land to the south of Dublin Airport Terminal 2. AI received 13/02/2025 / 0.1 km away / 27 February 2025Granted
- F11A/0333The installation of 13 no. banner advertisement signs. The proposed b / 0.1 km away / 27 October 2011Granted
- F21A/0594Permission for continuation of use of the existing site office structure at "The Green", Dublin Airport Central, Dublin Airport, Swords, Co Dublin, K67 X4X5. The application seeks permission for the continuation of the existing use of the structure as a Covid Testing Centre for a period of up to 3 years. / 0.2 km away / 04 January 2022Granted
- F21A/0706An amendment to Planning Permission reference F19A/0084 as granted in respect of a new Thermal Storage Tank and all associated site works. The development will consist of: Replacement of the permitted single 250m3 horizontal storage vessel with 3 no. 80m3 vertical Thermal Storage Tanks arranged in series connection and all associated site works on a site of 418.68 sq.m. The tanks will measure 8m high by 3.8m diameter and have a combined capacity of 240m3 for the storage of hot water. They will be used to store excess heat and improve the energy efficiency of the existing Combined Heat and Power Plant serving Terminal 2. / 0.2 km away / 24 February 2022Granted
- F19A/0084Permission for development at 418.68 sq.m site. The development will c / 0.2 km away / 15 April 2019Granted
- F22A/0316The installation of the Thermal Storage tank permitted under Planning Reg Ref. F19A/0084 at a revised location to the east of the Terminal 2 Energy Centre, along with all associated site works including the erection of a new boundary fence around the Thermal Storage Tank. The tanks dimensions (16m x 4.8 m) and capacity (250m3) will remain unchanged. It will, as previously permitted, be used to store excess heat and improve the energy efficiency of the existing combined Heat and Power Plant serving Terminal 2. / 0.2 km away / 17 August 2022Granted
- F18A/0638The development will consist of enabling works to facilitate the manda / 0.2 km away / 10 January 2019Granted