F18A/0638: The development will consist of enabling works to facilitate the manda
Carousel No. 4 Building, Terminal 1 Service Road, Between Terminal 1 a
DecisionGrant permission
Decided10 January 2019
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F19A/0168An extension of the existing Terminal 1 baggage hall in two locations / 0.1 km away / 10 June 2019Granted
- F20A/0553The development will consist of the installation of a new facade and thermal envelope to all elevations of the upper two storeys of the original Terminal 1 building (i.e. 'Levels 40 & 50'), with enhanced and consolidated daa office space to be provided accross both levels, and associated development at roof level and Level 10 (i.e. Arrivals Level). The development will include: Removal of the existing vertical concrete fins from all elevations of the building; Extension of the existing floorspace at Levels 40 & 50 to include external balcony areas; Strip out and refurbishment of the existing office floorspace at Level 40; The conversion of existing car parking to office floorspace at Level 40; The creation of an enlarged roof skylight requiring a new opening through the existing roof slab, along with a new opening through the Level 50 floor slab to create a double-height internal light well; The creation of a consolidated plant enclosure at roof level; The relocation of existing roof level plant to the consolidated plant enclosure, and the removal of redundant plant as required; The relocation of existing telecommunications antennae at roof level; bicycle storage area for staff at level 10 (at the base of existing spiral); Reconfiguration of internal floorspace at Level 10 to create staff lobby area; and all ancillary development, demolition, site works and services. / 0.1 km away / 01 April 2021Granted
- F24A/0824EDAA PLC intends to apply for Permission for development at this site (c. 0.19 Ha), at Dublin Airport, Terminal 1 Arrivals, Terminal Complex, Collinstown, Swords, Co. Dublin otherwise bounded by Terminal 1 Departure Canopy to the North-West, Terminal 1 Arrivals Hall to the South-West, Terminal 1 Multi-Storey Car Park to the North-East and Terminal 2 to the South-East. The proposed development consists of the following works: a)Taxi rank enclosure •Demolition and dismantling of existing roofed enclosure; new electrical routes and drainage layouts; new solid roof with glazed sides enclosure to accommodate 115 no. passengers, with illumination, information screens and drainage connections; new signage and repainting to existing personnel hut. b)Taxi rank set-down area •Provision of 8 no. standard pick-up spaces; provision of 1 no. people with reduced mobility (PRM) pick-up space; provision of 1 no. multi-use pick-up space; provision of dual lane system to accommodate the adjacent bus lane and provision of central island to allow left hand entry to all vehicles. c) Departure road canopy •Repair to structure; paint treatment to bridge structures and to the extent of the adjoining RC structure supporting the departure and arrivals bridge; fitting new cable routes; fitting new cladding to the departure bridge steelwork; new ribbon style digital information screen and support framing. / 0.1 km away / 06 November 2024Granted
- F20A/0394Development at an existing bus stop at Lane 2, east of terminal 1 Multi-storey car park and development at an existing taxi rank at Lane 1, East of Terminal 1. The development will consist of: 1) A glass and stainless-steel bus shelter, 2.50m high x 1.38m deep x 5.84m long with internally illuminated advertising panels (total 19.4m.sq); 2) A freestanding digital information display 3.07m high x 0.90m wide; 3) A ticket vending machine 1.83m high x 0.89 wide; 4) A polycarbonate and stainless-steel shelter extension, 2.64m high x 3.04m deep x 6.09m long, and all associated site development work, all on 2 no. sites totalling of 0.0058ha at an existing bus stop at Lane 2, east of terminal 1 Multi-storey car park and for development at an existing taxi rank at Lane 1, East of Terminal 1 at Dublin Airport, Collinstown, Co. Dublin. / 0.1 km away / 30 September 2020Granted
- F16A/0167The erection of a solar photovoltaic (PV) array on the northern end of / 0.2 km away / 14 June 2016Granted
- F24A/0160DAA proposes the installation of / 0.2 km away / 23 April 2024Granted
- F14A/0149Erection of 1 no. backlit advertising sign to be affixed to the facade / 0.2 km away / 30 May 2014Granted
- F25A/0404EThe development will consist of the installation of new lightweight advertising display frames on both sides of the 27 airbridges located on the airside apron at both Piers 3 and 4 at Dublin Airport, including the removal of the existing displays, the installation of new displays and all associated site works. / 0.2 km away / 27 June 2025Granted