F25A/0404E: The development will consist of the installation of new lightweight advertising display frames on both sides of the 27 airbridges located on the airside apron at both Piers 3 and 4 at Dublin Airport, including the removal of the existing displays, the installation of new displays and all associated site works.
Piers 3 & 4 Airbridges, Airside Apron, Dublin Airport, Collinstown, Co
DecisionGrant permission
Decided27 June 2025
Application typePermission
Source documents6
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / F25A.0404_D.pdf / Document 1116723Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / F25A.0404_CE.pdf / Document 1116722Source PDF
- Final GrantSource: planningapi.agileapplications.ie / F25A_0404E_Final_Grant.pdf / Document 1124930Source PDF
- ReportsSource: planningapi.agileapplications.ie / F25A-0404E_-_ANCA.pdf / Document 1106613Source PDF
- ReportsSource: planningapi.agileapplications.ie / F25A-0404E-DAA.pdf / Document 1111351Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- F18A/0552A covered pedestrian walkway for a distance of 80m, on the south-easte / 0.2 km away / 16 January 2019Granted
- F15A/0234Permission for development of 1. Providing a hard standing area (1,289 / 0.2 km away / 21 August 2015Granted
- F16A/0200The creation of a Passenger Transfer Facility, comprising a three stor / 0.2 km away / 27 July 2016Granted
- F18A/0638The development will consist of enabling works to facilitate the manda / 0.2 km away / 10 January 2019Granted
- F15A/0580Providing a twin feeder, aviation fuel, underground, hydrant pipeline / 0.2 km away / 11 February 2016Granted
- F19A/0168An extension of the existing Terminal 1 baggage hall in two locations / 0.2 km away / 10 June 2019Granted
- F20A/0553The development will consist of the installation of a new facade and thermal envelope to all elevations of the upper two storeys of the original Terminal 1 building (i.e. 'Levels 40 & 50'), with enhanced and consolidated daa office space to be provided accross both levels, and associated development at roof level and Level 10 (i.e. Arrivals Level). The development will include: Removal of the existing vertical concrete fins from all elevations of the building; Extension of the existing floorspace at Levels 40 & 50 to include external balcony areas; Strip out and refurbishment of the existing office floorspace at Level 40; The conversion of existing car parking to office floorspace at Level 40; The creation of an enlarged roof skylight requiring a new opening through the existing roof slab, along with a new opening through the Level 50 floor slab to create a double-height internal light well; The creation of a consolidated plant enclosure at roof level; The relocation of existing roof level plant to the consolidated plant enclosure, and the removal of redundant plant as required; The relocation of existing telecommunications antennae at roof level; bicycle storage area for staff at level 10 (at the base of existing spiral); Reconfiguration of internal floorspace at Level 10 to create staff lobby area; and all ancillary development, demolition, site works and services. / 0.3 km away / 01 April 2021Granted
- F24A/0965EThe provision of apron bus access facilities at Terminal 2, comprising the construction of a vertical circulation core (10.95m high) to the south of Terminal 2 (airside), linking to Terminal 2 via a glazed passenger bridge. The development will also include minor road re-alignment works, the provision of a bus set-down area to the east of the vertical circulation core, a covered walkway and all ancillary development, site works and services on land to the south of Dublin Airport Terminal 2. AI received 13/02/2025 / 0.3 km away / 27 February 2025Granted