F15A/0580: Providing a twin feeder, aviation fuel, underground, hydrant pipeline
DAA, Airfield, South Apron Village, Bond Road, Corballis Park, Dublin
DecisionGrant permission
Decided11 February 2016
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F15A/0234Permission for development of 1. Providing a hard standing area (1,289 / 0.1 km away / 21 August 2015Granted
- F25A/0404EThe development will consist of the installation of new lightweight advertising display frames on both sides of the 27 airbridges located on the airside apron at both Piers 3 and 4 at Dublin Airport, including the removal of the existing displays, the installation of new displays and all associated site works. / 0.2 km away / 27 June 2025Granted
- F16A/0167The erection of a solar photovoltaic (PV) array on the northern end of / 0.2 km away / 14 June 2016Granted
- F20A/0553The development will consist of the installation of a new facade and thermal envelope to all elevations of the upper two storeys of the original Terminal 1 building (i.e. 'Levels 40 & 50'), with enhanced and consolidated daa office space to be provided accross both levels, and associated development at roof level and Level 10 (i.e. Arrivals Level). The development will include: Removal of the existing vertical concrete fins from all elevations of the building; Extension of the existing floorspace at Levels 40 & 50 to include external balcony areas; Strip out and refurbishment of the existing office floorspace at Level 40; The conversion of existing car parking to office floorspace at Level 40; The creation of an enlarged roof skylight requiring a new opening through the existing roof slab, along with a new opening through the Level 50 floor slab to create a double-height internal light well; The creation of a consolidated plant enclosure at roof level; The relocation of existing roof level plant to the consolidated plant enclosure, and the removal of redundant plant as required; The relocation of existing telecommunications antennae at roof level; bicycle storage area for staff at level 10 (at the base of existing spiral); Reconfiguration of internal floorspace at Level 10 to create staff lobby area; and all ancillary development, demolition, site works and services. / 0.2 km away / 01 April 2021Granted
- F19A/0168An extension of the existing Terminal 1 baggage hall in two locations / 0.2 km away / 10 June 2019Granted
- F16A/0046The construction of a passenger segregation facility at Pier 2, compri / 0.3 km away / 08 April 2016Granted
- F23A/0104Daa plc intend to seek planning permission for development / 0.3 km away / 28 April 2023Granted
- F18A/0638The development will consist of enabling works to facilitate the manda / 0.3 km away / 10 January 2019Granted