F16A/0180: Installation of a 3m high "lamp post" style relief vent stack servicin
Lymewood Mews Apartments ( No 2), Santry Avenue, Santry, Dublin 9
DecisionGrant permission
Decided16 June 2016
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Lymewood Mews Apartments ( No 2), Santry Avenue, Santry, Dublin 9?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F16A/0514The construction of a new 5 storey office building with an overall hei / 0.1 km away / 10 April 2017Granted
- SHD/008/21ABP-313317-22 The proposed development will consist of the construction of a residential development comprising of 5 no. apartment blocks containing 255 no. apartment units to include 11 no. 1-bedroom units, 229 no. 2-bedroom units and 15 no. 3-bedroom units together with a childcare facility, shared residential services in a single storey between Blocks 2 and 3, and open spaces over a shared basement. Each apartment block will comprise of: • Block 1 will be an 8 storey block containing 49 no. apartment units consisting of 7 no. 1-bedroom unit, 42 no. 2-bedroom units with a childcare facility (c. 398 sq.m) at ground floor level with associated outdoor play area; • Block 2 will be a 9 storey block providing a total of 60 no. apartment units comprising 1 no. 1-bedroom unit, 57 no. 2-bedroom units, 2 no. 3-bedroom units with a concierge/multifunction area (c. 246 sq.m) at ground floor level extending into a single storey block and the provision of a residential gym (73 sq.m); •Block 3 will be a 7-8 storey block providing a total of 47 no. apartment units comprising 1 no. 1-bedroom unit, 38 no. 2-bedroom units and 8 no. 3-bedroom units; • Block 4 will be an 8-9 storey block providing a total of 52 no. apartment units comprising 1 no. 1-bedroom unit, 49 no. 2-bedroom units and 2 no. 3-bedroom units; and • Block 5 will be a 5-9 storey block providing a total of 47 no. apartment units comprising 1 no. 1-bedroom unit, 43 no. 2-bedroom units and 3 no. 3-bedroom units. The development will also provide: - 277 no. associated car parking spaces (including 5 no. disabled parking) at basement level, 16 no. car parking spaces (including 1 no. disabled parking and 2 no. car sharing) at surface level, 8 no. motorbike parking spaces at basement level, 600 no. cycle parking spaces at basement level and 128 no. cycle number spaces at surface level (including 72 no. of sheltered spaces); - a new vehicular access ramp to basement level; - private open space to apartments in the form of terraces, balconies and gardens; - communal and public open spaces including play areas; and - all associated plant, drainage arrangements, works to facilitate utility connections, substation, boundary treatment, landscaping, public lighting, refuse storage, construction compounds, vehicle access and site development works. The application contains a statement setting out how the proposal will be consistent with the objectives of the Fingal Development Plan 2017-2023. An Environmental Impact Assessment Report has been prepared in respect of the proposed development and accompany this application. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Acts 2000, notwithstanding that the proposed development materially contravenes the Fingal Development Plan 2017-2023 other than in relation to the zoning of the land. The application may also be inspected online at the following website set up by the applicant: www.whitehavenshd.com / 0.1 km away / 28 March 2023Granted
- F11A/0300Development on a site of circa 0.034 ha. The proposed development wil / 0.1 km away / 30 September 2011Granted
- F23A/0709The development will consist of: / 0.1 km away / 23 January 2024Granted
- F16A/0181Installation of a 3m high "lamp post" style relief vent stack servicin / 0.2 km away / 16 June 2016Granted
- F20B/0333The development will consist of conversion of existing attic space to a new bedroom with new dormer window and 1 No. velux window to the rear, 2 No. new windows to the side elevation and all associated ancillary site works. / 0.2 km away / 09 February 2021Granted
- F23A/0276Retention permission for development at Santry Sports Surgery Clinic, Northwood Avenue, Santry, Dublin 9. The development consists of an infill extension to the existing Santry Sports Clinic comprising a ground floor extension to the existing Call Centre, Theatre Store at first floor level and 3 no. Physiotherapy Stores at third floor level. Retention permission is also sought for a stand alone modular Training Room. / 0.2 km away / 18 July 2023Granted
- F18A/0205Amendments to planning permission granted under Fingal Council Reg. Re / 0.2 km away / 18 June 2018Granted