F23A/0709: The development will consist of:
Unit 1, Building 1, Swift Square, Santry, Dublin 9, D09 A0E4
DecisionGrant permission
Decided23 January 2024
Application typePermission
Source documents9
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Unit 1, Building 1, Swift Square, Santry, Dublin 9, D09 A0E4?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Chief Executives OrderSource: planningapi.agileapplications.ie / F23A_0709_CE.pdf / Document 904604Source PDF
- Final GrantSource: planningapi.agileapplications.ie / F23A_0709_FG.pdf / Document 909300Source PDF
- ReportsSource: planningapi.agileapplications.ie / F23A_-_0709_Uisce_Eireann.pdf / Document 897578Source PDF
- ReportsSource: planningapi.agileapplications.ie / F23A0709_WS.pdf / Document 897657Source PDF
- ReportsSource: planningapi.agileapplications.ie / F23A_-_0709_Waste_Enforcement_.pdf / Document 900445Source PDF
- ReportsSource: planningapi.agileapplications.ie / F23A_-_0709_DAA.pdf / Document 902277Source PDF
- ReportsSource: planningapi.agileapplications.ie / F23A_-_0709_Transportation.pdf / Document 903738Source PDF
- ReportsSource: planningapi.agileapplications.ie / F23A_-_0709_Parks.pdf / Document 903760Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- F11A/0300Development on a site of circa 0.034 ha. The proposed development wil / 0.1 km away / 30 September 2011Granted
- F16A/0181Installation of a 3m high "lamp post" style relief vent stack servicin / 0.1 km away / 16 June 2016Granted
- F16A/0514The construction of a new 5 storey office building with an overall hei / 0.1 km away / 10 April 2017Granted
- F18A/0348Retention of first floor mezzanine store with a floor area of 54m². Th / 0.1 km away / 15 August 2018Granted
- F17A/0469Retention of a doctor's surgery, medical centre including signage, wit / 0.1 km away / 27 September 2017Granted
- F16A/0180Installation of a 3m high "lamp post" style relief vent stack servicin / 0.1 km away / 16 June 2016Granted
- F23A/0663The development consists of an extension to office Unit D1d at ground floor and provision of a first floor level above the unit for use as a Class 2 office together with all associated works including: omission of a window to the eastern elevation; provision of an internal stairway; provision of windows on the northern elevation at both levels; provision of an external terrace at ground floor level; and provision of a balcony at first floor level. The total floor area of the extension to be retained is 118.1sq.m. The total gross floor space of the extended office unit is 191.4sq.m. / 0.1 km away / 15 December 2023Granted
- F18A/0584Change of use of Unit D1d (73 sq.m.) from Doctor's surgery to office; / 0.1 km away / 11 December 2018Granted