F17A/0748: Revisions to a 10 storey over basement 325 bedroom hotel (c. 31,757sq.
Site west of Stockhole Lane/Clonshaugh Road, Clonshaugh, Co. Dublin.
DecisionGrant permission
Decided15 February 2018
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F19A/0534Construction of a single storey office building of 134sq.m. gross floor area, located at ground floor level to the permitted decked car park. Mechanical plant will be provided above at deck level of the car park and will be screened by a pergola. The proposed development also includes the construction of a single storey building housing an ESB substation and switch room located adjacent to a reconfigured stair and lift core for the decked car park; a single storey plant room; and reconfiguration of car parking spaces (to include provision of 8 no. additional disabled spaces and reduction of 65 no. spaces), and landscaping to facilitate relocated main lift and stair core. Ancillary landscaping and reconfigured car parking layout at ground and upper floor level of the decked car park is also included, alongside all associated infrastructure works, all relating to a permitted hotel under planning Reg. Ref. F08A/1305 (ABP Ref: PL06F.232704), as amended under Reg. Ref. F17A/0748. / 0.0 km away / 13 January 2020Granted
- F16A/0579Development on a site of approximately 1.35 hectares located west of S / 0.0 km away / 28 March 2017Granted
- F08A/1305/E1A 325 bedroom hotel with associated spa and leisure facilities, meetin / 0.0 km away / 04 December 2014Granted
- F21A/01472 no single storey light industrial buildings (total floor area of 3,333 sq.m) accommodating 3 units including ancillary office space; internal site road (356m) with associated verges and footpaths accessed via internal distributor road; 84 no car parking spaces; 42 no. bicycle parking spaces; surface water attenuation; sub-station and switch room; relocation of overhead power lines; pedestrian entrance gate to adjoining petrol station site; totem signage at entrance to development; landscaping and boundary treatments; site works and services; all on a site of 1.94ha. AI received 06/09/21 / 0.0 km away / 01 October 2021Granted
- F23A/0006The development will consist of modifications to a permitted Light Industrial Scheme (as granted under Fingal County Council Reg. Ref. F21A/0147). The amendments principally comprise: an increase in the maximum height of Unit Nos 1,2 and 3 from 10 metres to 17 metres; provision of Roof PV Panels in lieu of the Roof Lights on Unit Nos 1,2 and 3 elevational changes including the provision of a Green Wall; relocation of the ESB Substation and Switch Room; and all associated site and development works above and below ground. The permitted Total Gross Floor Area of 3,333 sq m will remain unchanged. / 0.0 km away / 23 February 2023Granted
- F14A/0250Construction of a new ESB sub-station ancillary to a previously grante / 0.1 km away / 12 August 2014Granted
- F21A/0181Change of use from permitted retail use to to retail use including the sale of alcohol for consumption off the premises (i.e. off licence use) within the overall retail unit where the floor area for the off licence is 1.3sqm and is ancillary to the primary retail use. / 0.1 km away / 24 May 2021Granted
- F25A/0862EThe development predominantly comprises of retention permission for various amendments to the development permitted under Fingal County Council Planning Reference F22A/0079. Specifically, 1 no. additional high power electric vehicle charging unit, 6 no. additional parking spaces, and bollards, existing modular substation in lieu of previously approved substation, 3 no. additional lighting columns, various signage elements, and all associated site development works. Plus permission for proposed c 1.2 - 2.0m high hedging and low level planting between EV charging facilities and road. / 0.1 km away / 17 November 2025Granted