F18A/0117: Planning permission for modifications to the site layout as permitted
Hampton Gardens, Naul Road, Balbriggan, Co. Dublin
DecisionRefuse permission
Decided04 May 2018
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F17A/0305The construction of 2 no. one bedroom two storey houses in a semi-deta / 0.4 km away / 20 July 2017Refused
- F16A/0603The development will consist/consists of the construction of 2 no. hou / 0.4 km away / 16 February 2017Refused
- F24A/0998ERetenion is sought for as-constructed vehicular entrance, fence & gates. / 0.4 km away / 18 December 2024Refused
- F26A/0186EThe Development will consist of: The construction of a 4 storey building with part 3 storey building with roof garden. A) Two no. Commercial units at ground floor level, with bin and bike stores at ground floor level. B) 12 no. Apartments (5 no. two bed units, 6 no. one bed units, 1 no. 3 bed unit) connection to public foul, water and surface water sewer. C) Associated landscaping works including dedicated area for public art space, boundary walls and all associated site works. / 0.5 km away / 07 May 2026Refused
- F24A/0278The Development will consist / 0.5 km away / 20 May 2024Refused
- F22A/0361Permission for construction of a 3 Storey Building with Roof Garden level. The development will consist of A. Ground floor creche and medical centre (3 consultants offices) B. First floor apartments (6 no. two bedroom units), one office suite C. Second floor apartments (4 no. two bedroom units) D. Roof level garden connection to public foul, water and surface water sewer, bike and bin store, landscaping, boundary walls and all associated site works. AI received 15/05/23 SAI received 25/05/23 / 0.5 km away / 21 June 2023Refused
- F24A/0954EPlanning Permission /retention sought for single storey domestic extension / structures to side / rear & all associated site works. / 0.6 km away / 13 December 2024Refused
- LRD0048/S3EThe development will consist of the construction of 197 no. dwellings,open space, and ancillary infrastructure will facilitate Phase 4 of the lands at Ladywell in Balbriggan as follows: A) 129 no. terraced and semi-detached houses comprising 55 no. 2-bedroom houses (2 storey), 67 no. 3-bedroom houses (2 storey) and 7 no. 4-bedroom houses (3 storey) [house types with variants]; B) 18 no. terraced and semi-detached 3 bedroom townhouse dwellings; 18 no. Later Living Units (8 no. 1 bedroom & 10 no. 2 bedroom - all bungalows) [house types with variants]; C) 12 no. 1 bedroom Maisonettes in 6 no. 2-storey semi-detached buildings, and 4 no. 1 bedroom apartments in a 3-storey building (all apartments with terraces) along with 1 no. retail/café unit (c.165 sq. m) and 1 no. retail/medical unit (c. 185 sq. m) [including 'back of house area' & both units to be able to be sub-divided and amalgamated]; D) 16 no. duplex apartments (comprising 8 no. 1 bedroom [with terrace] and 8 no. 3 bedroom units) in 4 no. 3 storey buildings; E) Public open space c.0.85 hectares (with an additional c.0.76 hectares of riparian corridor open space), hard and soft landscaping (including public lighting & boundary treatment) and communal/semi-private open space (c. 660 sq. m) for the proposed townhouse, duplex and apartment units; F) Vehicular access will be provided via the Boulevard Road along with the provision of car parking spaces (280 no.), bicycle parking spaces and all internal roads and footpaths and bicycle and bin stores; G) Provision of surface water attenuation measures, (including widening of Clonard Brook), connection to water supply, provision of foul drainage infrastructure to Irish Water specifications and all ancillary site development, construction, and landscaping works [and temporary construction access from local road L1130]; H) The proposal will also amend the layout to elements of the shared layout across the permitted phases to include (Phase 3A [F21A/0055;ABP Ref:312048-21] relating to 29 no. dwellings replaced with 26 no. dwellings, Phase 3B [F22A/0526] relating to layout and Phase 3C [F22A/0670] relating to 3 no. dwellings replaced with 4 no. dwellings and associated amendments to attenuation (Clonard stream) and services. I) Provision of signalised upgrade of the junction of Boulevard Road and the Clonard Road (R122). An Environmental Impact Assessment Report and a Natura Impact Statement have been prepared in respect of the proposed development and submitted with this LRD application. A dedicated website has been set up for the LRD application which can be viewed at https://folkstownlrd.ie/ AI received 09/10/24 / 0.6 km away / 14 November 2024Refused