Unit B5, Airside Enterprise Centre, Swords, Co. Dublin.
Planning application F20A/0504
DecisionGrant permission & grant retention
Decided05 February 2021
Application typePermission and Retention
Source documents10
Site
What is on file
0refusal reasons12conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development to be retained in accordance with plans and additional information received.Compliance
- 2Retention permission restricted to development described in public notices and specified drawing.Compliance
- 3Car parking spaces to be reserved for staff and clients of permitted development only.Traffic Access
- 4Submit and implement secure, sheltered cycle parking and complete footpath/cycle area works.Traffic Access
- 5Building to be provided with noise insulation appropriate to Dublin Airport Noise Assessment Zone C.Design Materials
- 6No surface water to discharge into foul sewer; surface water drainage to comply with Greater Dublin Regional Code of Practice.Wastewater Drainage
- 7Applicant must sign connection agreement with Irish Water prior to commencement and adhere to conditions.Wastewater Drainage
- 8No advertising signs or structures except exempted development; signage not internally illuminated.Design Materials
- 9All public services including electrical and telephone cables to be located underground throughout the site.Design Materials
- 10Prevent spillage or deposit of materials on roads; repair any damage caused to public roads during construction.Construction Management
- 11Restrict construction site hours to 0800-1900 Mon-Fri, 0800-1400 Sat; no work on Sundays or Bank Holidays except with prior approval.Construction Management
- 12Pay financial contribution of €6,902 towards public infrastructure and facilities benefiting development area prior to commencement.Development Contribution
Planning a project near Unit B5, Airside Enterprise Centre, Swords, Co. Dublin.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 63 pages of searchable text on file.Included in site brief
10 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 9 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
10 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- F16A/0086Permission for the amalgamation of previously separated unit / 0.1 km away / 28 April 2016Granted
- F17A/0428Permision for change of use of existing ground floor retail unit to on / 0.1 km away / 17 October 2017Granted
- F14A/0049Constructing of a single storey car sales showroom with a floor space / 0.1 km away / 02 April 2014Granted
- F22A/0565Amendment to previously permitted development Fingal County Council Re / 0.2 km away / 08 December 2022Granted
- F15A/0002Car sales facility to consist of site preparation works (including cul / 0.2 km away / 24 June 2015Granted
- F24A/1029Intend to apply for permission and retention permission / 0.2 km away / 17 January 2025Granted
- F21A/0523(i) Retention permission for 'CLick and Collect' signage in the existi / 0.2 km away / 23 November 2021Granted
- F18A/0426The provision of an extension of 750 sq.m. gross floor are (500 sq.m. / 0.2 km away / 28 January 2019Granted