F21A/0037: The proposed development will consist of the removal of an existing metal gate to be installed at the same location, within the existing boundary treatment metal railing fence to accommodate ease of access to Building 10, and pedestrian access footpaths off the existing unnamed private access road to access the facilities maintenance building. The proposed replacement of the existing gate shall be similar in height and appearance with the installation of approximately 600mm fencing above the new gate to be in line with the existing fence line. the development also includes modification works to allow new access roads to the entry points of the existing training facility building; the provision of security bollards to allow secure access; relevant utility services; and all associated ancillary works.
Building 10, Oberstown Children Detention Campus, Oberstown, Lusk, Co
DecisionGrant permission
Decided22 April 2021
Application typePermission
Source documents10
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Building 10, Oberstown Children Detention Campus, Oberstown, Lusk, Co?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / 14AFC2BCA44211EBBDBF3464A927EB6F.tif / Document 702719Source PDF
- Notification Of DecisionSource: planningapi.agileapplications.ie / 7D18F7388B2311EB94FD3464A927EB6F.tif / Document 715313Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / 14AFC2BFA44211EBBDBF3464A927EB6F.tif / Document 702682Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / 7D18F73B8B2311EB94FD3464A927EB6F.tif / Document 736649Source PDF
- Final GrantSource: planningapi.agileapplications.ie / CC6ADCF8C46511EB862E00505692C209.pdf / Document 727550Source PDF
- ReportsSource: planningapi.agileapplications.ie / F8FE607D74EE11EB8625005056929A5A.pdf / Document 733232Source PDF
- ReportsSource: planningapi.agileapplications.ie / 91AF609CA41011EB8626005056923C73.docx / Document 737498Source PDF
- ReportsSource: planningapi.agileapplications.ie / EB0ED21696CC11EB8626005056926D4A.docx / Document 741239Source PDF
- ReportsSource: planningapi.agileapplications.ie / F8FE608274EE11EB8625005056929A5A.docx / Document 741845Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- F22A/0020Permission for installation of a 5.2m high wire security fence with both vehicular pedestrian access gates at Oberstown Children Detention Campus. The proposed development will consist of the installation of a 33-meter-long, 5.2 meters high, 358 wire security fence known as Prison Mesh with a vehicular security gate and a separate pedestrian gate on the lands adjacent to Area A, Unit 1, Trinity Buildings within the Oberstown Children Detention Campus. The wire fence will adjoin an existing brick wall to the east and connect into an existing wire security fence to the west and shall be similar in colour and type to the existing security fencing at Oberstown Children Detention Campus. / 0.0 km away / 11 March 2022Granted
- F24A/0919EPermission to erect a detached single-storey 72m2 (12m x 6m x 3.8m high) permanent cabin with timber structure and flat roof for staff recreation at Oberstown Children Detention Campus, Oberstown, Lusk, Co. Dublin, K45 AY66. The proposed development will consist of a lobby, disabled WC, breakout space with kitchenette, and a 12m x 3m outdoor decking to be located on the lands to the south of the campus. The development also includes alteration to the existing adjacent footpath to provide access to the cabin and associated site works. / 0.1 km away / 11 December 2024Granted
- F23A/0181Planning permission is sought for construction of new detached storey and a half dwelling house, waste water treatment plant and percolation area, storm water percolation area, to include off street parking provision for 2no. vehicles, with access from new internal access road, on Plot No. 6, consequent to grants of outline planning permission ref. nos F21A/0278, and F19A/0532 (outline planning permission for 6 no. dwelling houses) at Plot 6 Oberstown, Lusk, Co. Dublin. AI received 01/08/23 / 0.2 km away / 28 August 2023Granted
- F21A/0278Planning permission consequent on the grant of outline permission (Reg. Ref. No. F19A/0532) is sought by Mollsky Ltd at Lands located at Oberstown, Lusk, Co Dublin. Outline permission was granted for a development consisting of the following: (i) Construction of 6 no. dormer detached dwellings; (ii) Provision of a new vehicular entrance and an internal access roadway; (iii) On-site wastewater treatment systems and percolation areas; and (iv) All associated ancillary works necessary to facilitate the development including, SuDS surface water drainage, site works, boundary treatments and landscaping. Permission consequent on the grant of outline permission (Reg. Ref. F19A/0532) is sought for the provision of the new vehicular entrance and an internal access roadway. Permission is also sought for all associated ancillary works necessary to facilitate the development including site works, boundary treatments, and landscaping. / 0.2 km away / 12 July 2021Granted
- F19A/0532Development consisting of the following: (i) Construction of 5 no. dormer detached dwellings; (ii) Provision of a new vehicular entrance and an internal access roadway; (iii) On-Site wastewater treatment systems and percolation areas; and (iv) All associated ancillary works necessary to facilitate the development including, SuDS surface water drainage, site works, boundary treatments and landscaping. Add Info received 1st October 2020. Add Info deemed Significant 6th October 2020. Revised Public Notices received 21st October 2020. / 0.2 km away / 17 November 2020Granted
- F10A/0504Construct a new two storey clubhouse together with secondary treatment / 0.3 km away / 18 April 2011Granted
- F14A/0052Retain changes to sports hall previously granted planning permission u / 0.3 km away / 01 April 2014Granted
- F15A/0211Development of the existing first floor area into a gymnasium and game / 0.3 km away / 02 July 2015Granted