SK Biotek Swords Campus, Watery Lane Townparks, Swords Co. Dublin, (bo
Planning application F22A/0673
DecisionGrant permission
Decided03 February 2023
Application typePermission
Source documents16
Site
What is on file
0refusal reasons7conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development carried out in accordance with lodged plans, particulars and specifications.Compliance
- 2Construction and Environmental Management Plan, Outline Construction and Demolition water management plan and EIA Screening Report implemented in full.Construction Management
- 3Submit detailed Construction Management Plan and Construction Traffic Management Plan for written approval prior to commencement.Construction Management
- 4No surface water/rainwater discharges into foul water system. Surface water drainage compliant with GDR Code of Practice. Connection agreement with Irish Water required.Wastewater Drainage
- 5Works hours 8am-7pm Mon-Fri, 8am-1pm Sat. Daily environmental checks. Noise abatement per BS5228. No diesel generators. Air emissions/odours not to impair amenities. RWMP required.Construction Management
- 6Construction and Demolition Resource Waste Management Plan (RWMP) prepared per Best Practice Guidelines (2021). Records available for inspection.Construction Management
- 7Area not used for storage of SEVESO substances without separate planning consent.Other
Planning a project near SK Biotek Swords Campus, Watery Lane Townparks, Swords Co. Dublin, (bo?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 109 pages of searchable text on file.Included in site brief
16 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 10 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
16 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- F23A/0103SK Biotek Ireland intend to apply for planning permission for developm / 0.0 km away / 07 February 2024Granted
- F12A/0005A) Installation of a new cryogenic condensation unit; b) construction / 0.0 km away / 29 February 2012Granted
- F16A/0404The construction of a single storey extension (floor area measuring 41 / 0.0 km away / 01 November 2016Granted
- F20A/0457Permission for the construction of a standard 4MWe ESB substation and / 0.1 km away / 09 November 2020Granted
- F14A/0212Construction of a temporary entrance for ground clearance works and un / 0.1 km away / 16 July 2014Granted
- F17A/0551Permission to erect new corporate advertising signage in pace of exist / 0.2 km away / 31 October 2017Granted
- F13A/0173Decommissioning and removal of all existing external above ground pipe / 0.2 km away / 08 July 2013Granted
- F14A/0035Retention and 10 year permission for 3 no single storey modular units / 0.2 km away / 14 January 2015Granted