F23A/0040: The development will consist of the provision of
ESB Belcamp 220 kV Substation, in the townlands of Clonshaugh and Belc
DecisionGrant permission
Decided26 October 2023
Application typePermission
Source documents13
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near ESB Belcamp 220 kV Substation, in the townlands of Clonshaugh and Belc?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / F9484FFDCFBA11EDB7AD9C7BEFBB54FD.tif / Document 887118Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / F9485000CFBA11EDB7AD9C7BEFBB54FD.tif / Document 887119Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / F23A_0040_CE.pdf / Document 892954Source PDF
- Final GrantSource: planningapi.agileapplications.ie / F23A_0040.pdf / Document 898592Source PDF
- ReportsSource: planningapi.agileapplications.ie / 4C93732853A111EE868800505692F3B2.docx / Document 867103Source PDF
- ReportsSource: planningapi.agileapplications.ie / 718F5101CED211ED868700505692C209.docx / Document 871834Source PDF
- ReportsSource: planningapi.agileapplications.ie / 8AA2CF18C3EA11ED868600505692E046.docx / Document 874563Source PDF
- ReportsSource: planningapi.agileapplications.ie / 9E20F22DBCCB11EDB91184C5A60C64E3.pdf / Document 876822Source PDF
- ReportsSource: planningapi.agileapplications.ie / ECDE4E93C26811EDB6DB4CEBBDB391AE.pdf / Document 885720Source PDF
- ReportsSource: planningapi.agileapplications.ie / F23A_-_0040_AI_Transport.pdf / Document 888955Source PDF
- ReportsSource: planningapi.agileapplications.ie / F23A_-_0040_AI_Parks.pdf / Document 892581Source PDF
- ReportsSource: planningapi.agileapplications.ie / F23A_-_0040_Parks&Green_Infrastructure.pdf / Document 892582Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- F21A/0681Mayne Stability Limited intends to apply for permission for a period of 10 years development of a Synchronous Compensator Development (Grid Stabilisation Facility) on the site of c. 1.65 ha at lands south of Belcamp 220kV Substation, Belcamp, Dublin 17. The proposed development will consist of the following elements within the administrative boundary of Fingal County Council: a) A Grid Stabilisation Facility containing 1 No. High Inertia Synchronous Compensator (HISC) unit enclosed within a steel clad framed style structure (12.1m max height) and supported by 8 No. electrical equipment containers (containing ancillary power supply products including a static frequency converts, MV switchgear, exciters, LV distribution, control room, welfare and office), main, auxiliary & start-up electrical transformers, generator circuit breaker, switchgear equipment, External cooler units and 1 No. back up diesel generator and associated diesel storage tank; b) A 220kV High Voltage Gas Insulated Switchgear (GIS) compound containing a GIS building with all control & HV equipment within a single storey building (13.2m max height). The building will be surrounded by a compound road and contained within a 2.6m high galvanised steel palisade fence; c) A 220kV underground cable to the existing adjoining Eirgrid substation boundary; d) Associated elements comprising a clear span bridge over the River Mayne, various underground cables and ducts, equipment plinths, boundary security fence, compound lighting and palisade gates and fencing, security lighting, CCTV, internal access roads, hardstanding areas and all necessary foundations works for the above compounds. A concurrent planning application is being made to Dublin City Council which relates to a portion of lands to the south of the site of c. 0.94 ha which provides for a new access entrance from the R139 and a clear span bridge crossing over the River Mayne, internal access tracks, security fencing, temporary construction compound, landscaping, and drainage. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The NIS may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the Planning Authority during its public opening hours. AI received 3/8/2022 / 0.2 km away / 13 September 2022Granted
- 3041/22Mayne Stability Limited intends to apply for permission for a period of 10 years for the development of access to the Synchronous Compensator Development (Grid Stabililisation Facility) on the site of a c 0.94 ha. at lands south of Belcamp 220KV substation, Belcamp Dublin 17. The proposed development will consist of the following elements within the administrative boundary of Dublin City Council: a) New access entrance from the R139 and a clear span bridge crossing over River Mayne. b) Internal access tracks, security fencing, temporary construction compound, landscaping, and drainage. A concurrent planning application is being made to Fingal County Council which relates to the lands directly to the north of the site of c.1.65 ha for the construction of A Grid Stabilisation Facility containing 1 No. High Inertia Synchronous Compensator (HISC) unit enclosed within a steel clad framed style structure (12.1m max height) and supported by 8 No. electrical equipment containers (containing ancillary power supply products including a static frequency converts, MV switchgear, exciters, LV distribution, control room, welfare and office), main, auxiliary & start-up electrical transformers, generator circuit breaker, switchgear equipment, External cooler units and 1 No. back up diesel generator and associated diesel storage tank; A 220kV High Voltage Gas Insulated Switchgear (GIS) compound containing a GIS building with all control & HV equipment within a single storey building (13.2m max height). The building will be surrounded by a compound road and contained within a 2.6m high galvanised steel palisade fence; A 220kV underground cable to the existing adjoining Eirgrid substation boundary; Associated elements comprising a clear span bridge over the River Mayne, various underground cables and ducts, equipment plinths, boundary security fence, compound lighting and palisade gates and fencing, security lighting, CCTV, internal access roads, hardstanding areas and all necessary foundations works for the above compounds. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The NIS may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the Planning Authority during its public opening hours. / 0.3 km away / 30 August 2022Granted
- WEB1600/23RETENTION: The retention of the existing scrolling internally illuminated double sided ‘Metropole’ advertising display case mounted on an offset leg. / 0.4 km away / 14 September 2023Granted
- F23A/0549Planning permission for the installation of / 0.4 km away / 06 November 2023Granted
- F24A/0974EThe development will consist of the undergrounding a section of the Grange-Collinstown 38kV overhead line. The proposed alteration will comprise the installation of 2 no. lattice steel towers of maximum height of 13.2m. The section of existing overhead line to be removed, consists of 3 no. overhead conductors and 3 no. existing wooden pole sets. The associated overheard wires will be removed as part of the alteration. AI Rcvd 11/3/25 / 0.4 km away / 27 March 2025Granted
- F19A/0149Remediation by excavation and removal of circa 22,000 cubic metres / 0.5 km away / 17 July 2019Granted
- 3504/22Planning permission for development at this site will consist of demolishing an existing shed to the rear of the existing site and building a new ground & first floor extension to the rear of the existing house. A proposed new ground floor only porch to the front of the existing house and all ancillary works. / 0.6 km away / 05 May 2022Granted
- F08A/1217/E1Permission to environmentally remediate an area of 1.5 hectares on par / 0.7 km away / 08 August 2014Granted