GrantedDecided 06 February 2024Fingal County Council

Leastown Lane, Oldtown, Co. Dublin, A45 D542

Planning application F23A/0448
DecisionGrant permission
Decided06 February 2024
Application typePermission
Source documents12

Site

What is on file

0refusal reasons12conditions8nearby records

Proposed development

Application description published by Fingal County Council.
The development will consist of a new side extension, part single stor

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1All external finishes shall accord with Drawing No. PL-03 lodged on 26th July 2023, unless otherwise agreed in writing.Design Materials
  • 2The entire premises shall be used as a single dwelling unit.Occupancy
  • 3No foul drainage shall discharge into the surface water system; foul drainage must comply with EPA Code of Practice (March 2021).Wastewater Drainage
  • 4Foul drainage system must be in working condition and comply with EPA Code of Practice.Wastewater Drainage
  • 5Site suitability assessment and full on-site treatment plant design required if existing system cannot accommodate additional loading.Wastewater Drainage
  • 6Connection agreement with Irish Water required prior to commencement.Water Services
  • 7Surface water drainage must comply with Greater Dublin Regional Code of Practice (April 2006) and SuDS principles.Traffic Access
  • 8Soakaway must comply with BRE Digest 365, GDSDS, accommodate 30-year storm event, and be at least 5m from structures and 3m from boundaries.Wastewater Drainage
  • 9Construction hours restricted to 8am-7pm Mon-Fri, 8am-2pm Sat; no work on Sundays/Bank Holidays.Construction Management
  • 10Contractor must prevent spillage/deposit of debris on adjoining roads; developer responsible for repair costs.Compliance
  • 11All service cables (electrical, TV, telephone, public lighting) shall be run underground within the site.Design Materials
  • 12Developer to pay €16,324.03 to Planning Authority as contribution towards public infrastructure and facilities.Development Contribution

Planning a project near Leastown Lane, Oldtown, Co. Dublin, A45 D542?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.

Inside the decision file

Extracts from the council's own decision documents for this application — 59 pages of searchable text on file.

12 council documents — in the €39 site risk brief

Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 9 documents.

Source documents

Original council portal records and source PDFs where available.

12 council documents — in the €39 site risk brief

Site brief

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →