Unit 1, Swords Business Campus, Balheary Road, Swords, Co. Dublin, K67
Planning application F23A/0487
DecisionGrant permission
Decided08 December 2023
Application typePermission
Source documents9
Site
What is on file
0refusal reasons18conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development to be carried out in accordance with plans and specifications lodged with the application.Compliance
- 2Permission limited to statutory public notices and submitted plans; no subdivision without further permission.Compliance
- 3Use restricted to surgical service hub; no unauthorized changes or subdivision without further permission.Compliance
- 4Sign a connection agreement with Uisce Eireann prior to commencement and adhere to their standards.Wastewater Drainage
- 5Submit a formal written Waste Management Plan (WMP) for agreement prior to commencement.Environment Ecology
- 6Provide bicycle parking for long and short stay as per Fingal Development Plan standards; details to be agreed prior to commencement.Traffic Access
- 7No additional lighting, signage, structures or advertising devices to be erected externally without further permission.Design Materials
- 8Construction works hours: 8am-7pm Mon-Fri, 8am-1pm Sat; no Sundays/Public holidays. Deviation requires prior written agreement.Construction Management
- 9Comply with BS 5228:2009+A1:2014 noise abatement measures; noise levels at nearest sensitive location must comply with threshold limit values.Construction Management
- 10Submit a construction management plan detailing mitigation measures for emissions (noise, dust, air pollutants) and include daily environmental checks.Construction Management
- 11Manage works to prevent significant air emissions/odours beyond site boundary; no diesel generators permitted.Construction Management
- 12Operational noise must not cause reasonable cause for annoyance to noise sensitive locations; emissions must be broadband without tonal/impulsive elements.Construction Management
Planning a project near Unit 1, Swords Business Campus, Balheary Road, Swords, Co. Dublin, K67?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 39 pages of searchable text on file.Included in site brief
9 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 7 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
9 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- F25A/0615EPlanning Permission for modifications to planning previously granted u / 0.1 km away / 13 November 2025Granted
- F24A/1071E(i) material change of use of existing two-storey building (Unit 2) fr / 0.1 km away / 06 March 2025Granted
- F24A/0732EThe development will consist of (i) an external heat pump and primary / 0.1 km away / 24 February 2025Granted
- F25A/0549EModifications to planning previously granted under F24A/0732E: (i) re / 0.1 km away / 09 September 2025Granted
- F23A/0547The proposed development will comprise: / 0.1 km away / 08 December 2023Granted
- F24A/0975EThe development consists of retention of a single storey portacabin of / 0.1 km away / 14 August 2025Granted
- F25A/0456EPermission for the development of (i) campus signage, (ii) campus ligh / 0.1 km away / 15 July 2025Granted
- F25A/1005EPremission is sought for: 1) Material change of use of the existing u / 0.2 km away / 15 December 2025Granted