F25A/0549E: Modifications to planning previously granted under F24A/0732E: (i) reduction in area of an external heat pump and primary pumps compound, (ii) reduction in area of a separate external high temperature heat pump compound, (iii) reconfiguration and additional area for medical gases and mechanical rooms, (iv) additional area for medium voltage client room, (v) hardstanding, fencing, and all associated site works necessary to facilitate the development. Additional information received 20/08/2025
Swords Business Campus, Balheary Road, Swords, K67C6H6
DecisionGrant permission for retention
Decided09 September 2025
Application typeRetention
Source documents10
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / F25A.0549E_D.pdf / Document 1125937Source PDF
- Notification Of DecisionSource: planningapi.agileapplications.ie / F25A.0549E_D.pdf / Document 1131635Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / F25A.0549E_ce.pdf / Document 1125936Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / F25A.0549E_ce.pdf / Document 1131634Source PDF
- Final GrantSource: planningapi.agileapplications.ie / F25A_0549E.pdf / Document 1140114Source PDF
- ReportsSource: planningapi.agileapplications.ie / F25A0549E.docx / Document 1119810Source PDF
- ReportsSource: planningapi.agileapplications.ie / F25A0549E.docx / Document 1120267Source PDF
- ReportsSource: planningapi.agileapplications.ie / F25A.0549E_Air_and_Noise_Report.pdf / Document 1120566Source PDF
- ReportsSource: planningapi.agileapplications.ie / F25A-0549E.pdf / Document 1123378Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- F24A/0732EThe development will consist of (i) an external heat pump and primary pumps compound, (ii) liquid oxygen compound, comprised of a VIE (vacuum insulated evaporator) liquid oxygen primary tank (20,000 litres) of 8.40m in height and back-up VIE liquid oxygen tank (10,000 litres) of 7.50m in height, vaporisers 4.32m in height) and associated manifold plant room, (iii) bottle gases stores rooms, (iv) vacuum and medical air plant room, (v) an external high temperature heat pump compound, (vi) medium voltage, transformer and offloader rooms, (vii) backup electricity generator compound with associated fuel tank (18,000 litres) of 2.8m height, (viii) an external condenser unit compound, (ix) relocation of existing carparking and, (x) hardstanding, fencing, and all associated site works necessary to facilitate the development. AI Rcvd 16/12/2024 CAI received 31/01/2025 / 0.0 km away / 24 February 2025Granted
- F25A/0615EPlanning Permission for modifications to planning previously granted under F24A/0732E: (i) re-location of car parking spaces granted under F24A/0732E to alternative areas on the Swords Business Campus, (ii) modification of location and details regarding the attenuation storage, and all associated site works necessary to facilitate the development. Additional information received 12/09/2025 Clarification of Additional information received 17/10/2025 / 0.1 km away / 13 November 2025Granted
- F23A/0487The proposed development will comprise: (i) Change of use of existing two storey building (Unit 1 ) from office/warehouse to a surgical service hub; (ii) Internal fitout to facilitate development including: main reception area, cafe retail area, admission suites, sub-waiting areas, treatment rooms, exam rooms, anaesthetic rooms, operating theatres, second-stage recovery rooms, discharge lounge, and all ancillary rooms required to facilitate the surgical service hub use; and (iii) Drainage, landscaping, boundary treatments and all associated works necessary to facilitate the development. AI rcvd 17/11/2023 / 0.1 km away / 08 December 2023Granted
- F24A/1071E(i) material change of use of existing two-storey building (Unit 2) from office/warehouse to an endoscopy unit; including (ii) internal fitout to facilitate development comprising: main reception area, admission suites, sub-waiting areas, treatment rooms, exam rooms, procedure rooms, recovery rooms, discharge lounge, and all ancillary rooms required to facilitate the clinical use; and (iii) drainage, landscaping, boundary treatments and all associated works necessary to facilitate the development. AI Rcvd 14/2/25 / 0.1 km away / 06 March 2025Granted
- F23A/0547The proposed development will comprise: / 0.1 km away / 08 December 2023Granted
- F24A/0975EThe development consists of retention of a single storey portacabin of 120 sq.m. to the east of the existing building to accommodate 3 no. classrooms and toilet facility along with an access ramp; and all associated site and infrastructural works needed in order to facilitate the subject development. ** Additional Information Received 24/07/2025 ** / 0.2 km away / 14 August 2025Granted
- F25A/0456EPermission for the development of (i) campus signage, (ii) campus lighting, (iii) canopy to staff entrance at Unit 1, (iv) alterations to entrances and windows of Unit 1, (v) additional rooflight and plant to roof of Unit 1, (vi) new cladding to stair access to roof of Unit 1 and all associated site works necessary to facilitate the development. / 0.2 km away / 15 July 2025Granted
- F25A/0169EPermission for: 1) Material change of use of the existing unit from office to healthcare clinic. Including the provision of 4 no. consultation rooms, 1 no. physiotherapy room and ancillary rooms required to facilitate the medical use. 2) Provision of new wheelchair ramp to the front of the unit, including associated handrails and balustrades, to allow level access to the unit. 3) All associated works including drainage, landscaping, boundary treatments necessary to facilitate the development. AI Received 08/05/2025 / 0.2 km away / 28 May 2025Granted