FW13A/0024: Permission for a principal access road, associated services and
Killamonan and, Cherryhound, Co Dublin
DecisionGrant permission
Decided18 April 2013
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Killamonan and, Cherryhound, Co Dublin?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- FW25A/0261EThe development will consist of: revisions to the previously permitted Unit 4, which includes a main logistics/warehouse hall and ancillary office building (combined area of approximately 10,058 sqm) under Fingal County Council Reg. Ref. FW22A/0167. These revisions involve interior and exterior modifications to Unit 4 and associated external areas, resulting in a net increase of 139 sqm, including: (i) Modification of the height (from 8.3 to 8 m) and footprint of the permitted ancillary office building, comprising retracting the eastern elevation and extending the building footprint towards the northern elevation; (ii) Internal layout revisions and reconfiguration of spaces within Unit 4’s main logistics/warehouse hall and ancillary office building, including adding c. 116 sqm of mezzanine space for mechanical plant; (iii) Changes to elevations and facades, including adjustments to fenestration, minor design feature modifications, and updates to materials; (iv) Roof level revisions, including increased automatic ventilation openings, reduced permitted photovoltaic panels, 2 no. new roof access points, and relocation of an existing roof access; (v) Relocation of the permitted ESB substation and associated switch room from within Unit 4 to an external area as a standalone structure (c. 49.7 sqm); (vi) Revisions to the layout of permitted car, bicycle, and heavy goods vehicles (HGV) parking areas, resulting in a net reduction of 3 no. car parking spaces and 2 no. HGV parking spaces; (vii) Minor revisions to exterior spaces, including replacing the permitted mineral plaza with planting, omitting the permitted gatehouse, chemical storage and a section of footpath, relocating the permitted refuse area and plant compound, and providing 2 no. pedestrian crossings along with 2 no. access gates and fencing (c. 2.4 m) for the permitted fire tender access route; (viii) Demolition of existing ESB electricity pylon (c. 25 m height lattice tower) and installation of new electricity pylon (lattice tower with maximum height of 37 m) and associated reinstatement works; and, (ix) All other ancillary associated works. / 0.2 km away / 08 August 2025Granted
- FW19A/0006The development will consist of: 1: part single storey, part two st / 0.2 km away / 06 September 2019Granted
- FW25A/0298EThe development will consist of: revisions to the previously permitted communal facility (93sqm) under Fingal County Council Reg. Ref. FW22A/0167, which includes community space, security office, ancillary storage, covered external social space and associated external areas. These revisions involve interior and exterior modifications to the communal facility and associated external areas, including: (i) Reconfiguration and modification of the internal floor plan to remove the security office and introduce a kitchenette and a meeting room, reducing the total internal floor area from 93 sqm to 66.4 sqm; (ii) Modification to the canopy roof finish from a mono-pitched to a flat roof style, reducing the overall building height from 5.257m to 3.667m (a reduction of c.1.5m); (iii) Reduction of the canopy roof coverage area from c. 606sqm to 405sqm; (iv) Inclusion of dedicated integrated bin store/utilities enclosure (15.5sqm) to serve the communal facility and ancillary site; (v) Changes to elevations and facades, including adjustments to fenestration, minor design feature modifications, and updates to materials; (vi) Provision of a new vehicular access point to the southeast of the site; (vii) Provision of 10 no. car parking spaces and bicycle parking (5 no. bicycle stands); (viii) Provision of an access laneway to the south of the communal facility; (ix) Revisions to the landscaping to the associated external area and all other ancillary works. / 0.2 km away / 08 September 2025Granted
- FW13A/0023Development on a site of 15.78 hectares. The development will consist / 0.3 km away / 18 April 2013Granted
- FW14A/0134Retention permission for works completed at Killamonan. The subject of / 0.3 km away / 11 December 2014Granted
- FW14A/0019Planning permission for: i) a new water storage tank 6m in diameter a / 0.3 km away / 03 April 2014Granted
- FW21A/0102Permission to erect 4,886.00 m2 of photovoltaic panels on the roof of the dry warehouse building and freezer/chiller warehouse building in our factory with all associates site works. AI received 20/08/21 / 0.3 km away / 14 September 2021Granted
- FW22A/0167The development will consist of: the provision of c. 72,753sq.m of logistics and associated office uses across 5 no. buildings (Building 1, c. 23,936sq.m and a height of c. 17.25m, Building 2, c. 16,999sq.m and a height of c. 17.2m, Building 3, c. 13,472sq.m and a height of c. 17.25m, Building 4, c. 10,058sq.m and a height of c. 17.25m, and Building 5, c. 8,195sq.m and a height of c. 17.63m), within a business campus setting; associated yard areas, trailer and truck parking together with car and bicycle parking spaces at surface level; a single storey campus management building (c. 93sq.m) with an adjacent canopy and seating area to facilitate outdoor dining / social space; revised and new pedestrian, bicycle and vehicular entrances; internal pedestrian, bicycle and vehicular circulation including a new pedestrian and bicycle link to the R121; associated landscaping, parkland area and public open space, boundary treatments, lighting, signage, CCTV; associated drainage, attenuation and services; and all associated construction compounds and site works. An Environmental Impact Assessment Report accompanies the planning application. AI received 12/12/22 / 0.3 km away / 14 February 2023Granted