GrantedDecided 08 August 2025Fingal County Council

FW25A/0261E: The development will consist of: revisions to the previously permitted Unit 4, which includes a main logistics/warehouse hall and ancillary office building (combined area of approximately 10,058 sqm) under Fingal County Council Reg. Ref. FW22A/0167. These revisions involve interior and exterior modifications to Unit 4 and associated external areas, resulting in a net increase of 139 sqm, including: (i) Modification of the height (from 8.3 to 8 m) and footprint of the permitted ancillary office building, comprising retracting the eastern elevation and extending the building footprint towards the northern elevation; (ii) Internal layout revisions and reconfiguration of spaces within Unit 4’s main logistics/warehouse hall and ancillary office building, including adding c. 116 sqm of mezzanine space for mechanical plant; (iii) Changes to elevations and facades, including adjustments to fenestration, minor design feature modifications, and updates to materials; (iv) Roof level revisions, including increased automatic ventilation openings, reduced permitted photovoltaic panels, 2 no. new roof access points, and relocation of an existing roof access; (v) Relocation of the permitted ESB substation and associated switch room from within Unit 4 to an external area as a standalone structure (c. 49.7 sqm); (vi) Revisions to the layout of permitted car, bicycle, and heavy goods vehicles (HGV) parking areas, resulting in a net reduction of 3 no. car parking spaces and 2 no. HGV parking spaces; (vii) Minor revisions to exterior spaces, including replacing the permitted mineral plaza with planting, omitting the permitted gatehouse, chemical storage and a section of footpath, relocating the permitted refuse area and plant compound, and providing 2 no. pedestrian crossings along with 2 no. access gates and fencing (c. 2.4 m) for the permitted fire tender access route; (viii) Demolition of existing ESB electricity pylon (c. 25 m height lattice tower) and installation of new electricity pylon (lattice tower with maximum height of 37 m) and associated reinstatement works; and, (ix) All other ancillary associated works.

Site north of the Cherryhound-Tyrrelstown M2/M3 Link Road and west of
DecisionGrant permission
Decided08 August 2025
Application typePermission
Source documents7

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Fingal is in progress.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Site north of the Cherryhound-Tyrrelstown M2/M3 Link Road and west of?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →