FW13A/0121: Permission for the construction of a 208m2 single storey extension to
Connolly Hospital, Blanchardstown, Dublin 15
DecisionGrant permission
Decided09 December 2013
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Connolly Hospital, Blanchardstown, Dublin 15?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- FW23A/0336Permission is sought by the Health Service Executive for a new 3 storey extension to existing hospital buildings at Connolly Hospital Blanchardstown, Dublin 15. The proposed development which extends to 1690m2 is to accommodate new CT facilities at Ground Floor Level, ICU rooms and ancillary accommodation at First Floor level and supporting Plant room at Second Floor/Roof Level. Links to the existing Radiology, Emergency, and Theatres Departments are provided as part of the proposed extension along with a dedicated lift and stair core. A 54m2 single storey structure is to be demolished in order to facilitate the proposed development. / 0.0 km away / 03 January 2024Granted
- FW14A/0153Permission for a development at this site: Connolly Hospital Mill Road / 0.0 km away / 11 February 2015Granted
- FW18A/0171The development will consist of a new 124sqm single storey extension t / 0.1 km away / 12 March 2019Granted
- FW15A/0159Permission for provision of new 130 sqm single storey extension to exi / 0.1 km away / 05 February 2016Granted
- FW15A/0165Provision of new 260 sq.m. single storey extension to existing X-Ray D / 0.1 km away / 16 February 2016Granted
- FW13A/0021Permission for the development of the construction of a new single st / 0.1 km away / 30 April 2013Granted
- FW21A/0078Permission for the demolition of an existing single storey outbuilding (boiler house) and the removal of an existing surface level ancillary car park and associated vehicular access together with site clearance (including tree removal) and ground works to facilitate the redevelopment of the site. The proposed redevelopment of the site comprises the provision of a new 3-storey Education and Research Centre building to accommodate faculty offices, administration, auditorium and classrooms and entrance lobby and café, together with showers, changing and toilet facilities all at ground floor level. A small mezzanine level sits above the entrance lobby to provide further ancillary breakout space. At first floor level the building is arranged to provide office and administration space and meeting rooms along with tutorial rooms and recreational facilities including a fitness suite and breakout space. An external roof terrace is provided on the western side of the building at first floor level above the entrance level/café. The proposed second floor comprises medical diagnostics labs with ancillary lab spaces and ancillary offices, meeting room and staff facilities. The proposed building provides a total of 4,103 sq.m. of Gross Floor Area (GFA), excluding the external roof terrace and replacement boiler house. A new vehicular access with associated access and egress control barriers is proposed in a revised position to the north of the proposed building and south of the existing HSE Academic Building to serve the proposed ancillary surface level car park that will provide a service bay. 34 no. car parking spaces and a bicycle storeroom to provide 36 no. bicycle storage spaces. An additional 36 no. bicycle storage spaces (18 no. Sheffield type stands) are provided. Other works include the provision of a single storey, detached boiler house (15 sq.m), taxi drop-off and outdoor refuse storage enclosures/service yard together with associated flood mitigation works associated with Abbotstowm Stream. The flood mitigation works include the replacement of an existing downstream culvert (comprising a 1050 mm diameter concrete pipe) with a new 2.7 m x 1.5 m box culvert, approximately 55 m in length together with the installation of debris/security screen to head wall and provision of a low-level wall (approximately 300 mm in height) extending from the HSE Academic Building to the north of the development site extending southwards to the southern end of the ESB Substation immediately to the south of the development site. Proposed site works include the temporary closure of a section (approximately 55m in length) of the existing access road to St. Francis Hospice and the provision of a re-aligned temporary vehicular access road and footpath with associated traffic light system to facilitate temporary road access/arrangement for the duration of the construction stage of the replacement culvert. Other site works include site clearance and ground works, landscaping works and provision of external lighting and associated infrastructure provision to serve the car park (including underground surface water storage attenuation tank). Two (2 no.) wall mounted, back-lit signs are proposed at second floor level to the southern and western elevations of the building, respectively. The signs comprise standard RCSI coloured logo and lettering that measures approximately 1.75 m in width and 2.49 m in height (the logo measures approximately 1.7 m in height on top of RCSI lettering that measures approximately 0.61m in height) / 0.1 km away / 21 June 2021Granted
- FW22A/0023Retention permission for the development of lands within the grounds of Connolly Hospital. The proposed development will consist of 177sqm extension to the existing emergency department to provide two resuscitation rooms, a single bed isolation room, staff base, replacement relatives room, meeting room, toilets, support rooms and plant spaces in a single storey extension with dedicated roof top plant, including internal modifications to the existing building to provide a link corridor at the former relatives room with associated hard and soft landscaping and modifications to the carpark. / 0.1 km away / 04 April 2022Granted