Connolly Hospital, Blanchardstown, Dublin 15, Towland of Abbotstown
Planning application FW21A/0078
DecisionGrant permission
Decided21 June 2021
Application typePermission
Source documents13
Site
What is on file
0refusal reasons16conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development carried out in entirety in accordance with lodged plans, particulars, specifications, and information.Compliance
- 2External finishes in accordance with submitted plans (27 April 2021). Refuse store details to be submitted for written agreement.Design Materials
- 3No surface water/foul discharge. Compliance with Greater Dublin Regional Code of Practice for Drainage Works. Maintenance policy for SUDS/petrol-oil interceptors.Wastewater Drainage
- 4No advertising, signage or publicity material other than that shown on submitted drawings within curtilage or on facades without prior permission.Other
- 5No additional development above roof parapet level, including air handling equipment, storage tanks, ducts, or external plant, unless authorised by further planning permission.Other
- 6Developer shall sign a connection agreement with Irish Water prior to commencement of development.Water Services
- 7Details of zebra crossing points, raised ramp entry treatment, and additional future cycle parking submitted for written agreement. Construction and Traffic Management Plan agreed. Mobility Management Plan submitted within 18 months.Traffic Access
- 8Mitigation and management measures of food risk assessment implemented in full. All mitigation measures listed in Ecological Impact Assessment complied with.Environment Ecology
- 9Landscape Plan Dwg 60594174-SHT-20-0000-L-1001 implemented in full. Planting in first season. Trees replaced if dead/damaged within two years. Landscape Architect retained for supervision.Landscaping Boundary
- 10Arboricultural Method Statement and Tree Protection Plan submitted for written agreement. Qualified contractor for tree work per BS3998. Meeting with Arborist/Parks Officer. €80,000 tree & hedgerow bond lodged.Environment Ecology
- 11Details of waste streams, expected tonnages, and soil/stone export/import confirmed. Material assessed under Article 27 if applicable.Other
- 12Final Construction and Environmental Management Plan submitted for written agreement. Mitigation measures from Ecological Impact Assessment adopted. Best Construction Practices for sediment/silt control. Surface water management measures.Construction Management
Planning a project near Connolly Hospital, Blanchardstown, Dublin 15, Towland of Abbotstown?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 123 pages of searchable text on file.Included in site brief
13 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 8 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
13 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- FW13A/0121Permission for the construction of a 208m2 single storey extension to / 0.1 km away / 09 December 2013Granted
- FW24A/0154The proposed development includes the demolition of parts of the exist / 0.1 km away / 14 August 2024Granted
- FW14A/0153Permission for a development at this site: Connolly Hospital Mill Road / 0.1 km away / 11 February 2015Granted
- FW23A/0392The development will consist of the / 0.1 km away / 13 February 2024Granted
- FW23A/0336Permission is sought by the Health Service Executive for a new 3 store / 0.1 km away / 03 January 2024Granted
- FW12A/0101Retention of a single storey prefabricated building 5.08M high & link / 0.1 km away / 28 November 2012Granted
- FW18A/0012The development consists of the retention of a single storey prefabric / 0.1 km away / 16 March 2018Granted
- FW18A/0171The development will consist of a new 124sqm single storey extension t / 0.1 km away / 12 March 2019Granted