FW15A/0150: Permission for an 834 sq.m warehouse extension to a logistics warehou
6 Damastown Avenue, Damastown Industrial Estate, Dublin 15
DecisionGrant permission
Decided26 January 2016
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- FW19A/0098The development will consist of a 2941 sq.m. logistics warehouse build / 0.1 km away / 08 August 2019Granted
- FW21A/0108Development will consist of a 2480 sq.m logistics warehouse building, the height of which will not exceed 12.5m. This is inclusive of a reception area, wheelchair accessible toilet facilities and a plant room. Photovoltaic panels along the southern aspect of the roof structure not exceeding 150 sq.m. A new heavy goods vehicular entrance along Damastown Rise, 29 car parking spaces, 3 no. disability access parking spaces, cycle parking and a service yard to the rear (north) of the proposed building. Vehicular access for staff shall be via the existing vehicular entrance along Damastown Avenue, associated with the adjoining DG McArdle International Ltd site to the west of the proposed development. New boundary walls and railings detailing to the eastern and southern boundaries, all associated signage, lighting, landscaping and site development works. AI received 22/11/21 / 0.1 km away / 16 December 2021Granted
- FW23A/0295The development will consist of retention permission for / 0.1 km away / 14 November 2023Granted
- FW14A/0052Permission for a single storey extension and ancillary works / 0.1 km away / 19 June 2014Granted
- FW17A/0138Permission is sought for 2no. single storey extensions (220m2 total fl / 0.1 km away / 22 September 2017Granted
- FW19A/0232The construction of a Data Centre comprised of 4 no. buildings consisting of (a) Data Hall Building, (48,303 sq.m) 4 storey building with plant room over (b) Generator Building, (4,064 sq.m) 4 storey building over a single basement level, (c) Sprinkler Pump House building, (119 sq m.) single storey building, and (d) Security Hut, (21 sq.m.) single storey building with associated security barrier system, and the formation of a new vehicular entrance onto Damastown Avenue, 102 no. car parking spaces including 6 no. disabled car parking spaces, 30 no. cycle spaces, internal site roads and hardstanding, site lighting, perimeter security fencing and gates, site signage, soft landscaping, SUDS drainage system, and all other associated site works, on a 2.6709 hectare site at Damastown Avenue, Damastown Industrial Park, Macetown Middle, Mulhuddart, Dublin 15. Additional Information Lodged on 22nd May 2020 Clarification of Add Info received 27th August 2020 / 0.2 km away / 23 September 2020Granted
- FW14A/0127Permission to extend the existing premises by way of constructing a ne / 0.2 km away / 27 November 2014Granted
- FW19A/0121Reconfiguration of Existing layout and increased floor area of the exi / 0.2 km away / 02 December 2019Granted