FW18A/0079: The construction of a single storey waste recovery/transfer building w
Greenstar Materials Recovery Facility, Millennium Business Park, Cappa
DecisionGrant permission
Decided20 September 2018
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- FW22A/0016The development for which retention permission is sought consists of the retention of a single storey waste recovery/transfer building. The floor area of the building is 4226 sq.m and the height of the building at its highest from the finished floor level is 13.211m. The retention permission is also required for all associated site works and services. / 0.0 km away / 31 March 2022Granted
- FW18A/0016The proposed development consists of the installation of roof mounted / 0.1 km away / 23 March 2018Granted
- FW21A/0208The development will consist of retention permission for additional offices and staff facilities created at first floor level from that previously granted permission under planning reference no F05A/0225 together with all associated site works. / 0.1 km away / 14 December 2021Granted
- FW14A/0139Retention permission the construction of a new mezzanine floor at firs / 0.1 km away / 17 August 2015Granted
- FW16A/0016Planning permission is sought for a new free-standing, non-illuminate / 0.2 km away / 22 March 2016Granted
- FW21A/0248(i) Retention permission is sought for an existing storage yard (3,456 sq.m); Permission is sought for the provision of a temporary (5 year) storage yard comprising 3345 sq.m. The proposed storage yard will accommodate storage requirements arising from a national services and works contract with Gas Networks Ireland. Use of the storage yard will be ceased following the completion of the project in five years. The existing palisade fencing will be removed and replaces with an extended screening security mesh fencing. A verge of landscaping will be provided between the existing footpath and the proposed fencing. Works to provide the storage yard comprise of (a) stripping topsoil and excavating of in-situ material for the existing landscaped area and placement of imported gravel material pavement layers and wearing course; and (b) provision of a new private vehicular entrance to the yard. (iii) The proposed development includes all associated site development ancillary works necessary to facilitate the development including new dropped kerbs and pedestrian footpath at the proposed yard entrance and a land drain around the perimeter. Internal road works include road markings and traffic signage. / 0.3 km away / 17 February 2022Granted
- FW18A/0194The construction of 4 no. light industrial units with ancillary office / 0.3 km away / 17 September 2019Granted
- FW25A/0148EKilsaran Concrete Unlimited Company intend to apply for permission for development and retention permission for development at an existing concrete batching facility at Kilsaran, Millennium Business Park, Cappagh Road, Dublin 11, D11 R2HE. The proposed development amends Fingal County Council Reg. Ref FW18A/0087 (as extended by Reg. Ref. FW18A/0087/E1), which was subsequently amended by Reg. Ref. FW21A/0032. The development permitted has commenced and is in the process of being implemented. The development for which retention permission is sought consists of modifications to the permitted development as implemented on-site, described as follows: • Covered aggregate triple storage bay that replaces 3 no. previously permitted aggregate storage bays; • Amended design and layout of concrete batching plant (and ancillary, related plant) and concrete reclaimer; • Revised location of 2 no. weighbridges. The weighbridges to be retained do not have cabins; • Amended truck parking layout and an increase in truck parking by 5 no. spaces; • Reduced size of water tank and provision of associated plant and plantroom not previously permitted; • Larger ESB switchroom of c.55.5 sq.m in revised location. The previously permitted ESB substation to be retained as a storage unit; • With associated amendments to be retained to the permitted concrete pavement and tarmac areas, refuelling area, lighting, boundaries and landscape details. The development for which permission is sought consists of amendments to the permitted development comprising: • The relocation and amended design of a previously permitted office. The office has been reduced in size by c. 395.5 sq.m; • The removal of existing storage containers to facilitate an extension of c.191 sq.m to an existing workshop building; • Revised location of a wheelwash; • Alterations to the permitted car park layout and a reduction in car parking from 62 no. spaces to 40 no. spaces including for 2 no. disabled and 5 no. EV parking spaces; • The relocation of a permitted bicycle shelter and an increase in bicycle parking from 10 no. spaces to 20 no. spaces; • The provision of 5 no. e-bike spaces and 5 no. motorcycle spaces; • Amendments to permitted lighting, hard and soft landscaping and boundaries; • All other associated site excavation, infrastructural and site development works above and below ground. / 0.3 km away / 29 May 2025Granted