Lands to the front of GMC House, Millenium Business Park, Cappagh Road
Planning application FW21A/0248
DecisionGrant permission & grant retention
Decided17 February 2022
Application typePermission and Retention
Source documents7
Site
What is on file
0refusal reasons9conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development to be carried out in accordance with lodged plans and specifications.Compliance
- 2Hardstanding area of 3,345 sq.m shall be temporary and expire 5 years from final grant.Compliance
- 3Boundary treatment: 2.7m fence on southern/western boundaries; eastern boundary suitably screened.Design Materials
- 4Yield markings changed to stop markings and setback for HGV left turn.Traffic Access
- 5No surface water to foul sewer; drainage to comply with Greater Dublin Regional Code of Practice.Wastewater Drainage
- 6Sign connection agreement with Irish Water prior to commencement.Water Services
- 7All service cables (electrical, TV, telephone, lighting) to be run underground within the site.Design Materials
- 8Construction hours restricted to 0800-1900 Mon-Fri, 0800-1400 Sat. No work on Sundays/Bank Holidays.Construction Management
- 9Prevent spillage/deposit of materials on adjoining roads. Developer responsible for full cost of repair for any damage to public road.Construction Management
Planning a project near Lands to the front of GMC House, Millenium Business Park, Cappagh Road?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 30 pages of searchable text on file.Included in site brief
7 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 5 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
7 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- FW16A/0016Planning permission is sought for a new free-standing, non-illuminate / 0.1 km away / 22 March 2016Granted
- FW14A/0139Retention permission the construction of a new mezzanine floor at firs / 0.1 km away / 17 August 2015Granted
- FW21A/0208The development will consist of retention permission for additional / 0.2 km away / 14 December 2021Granted
- FW17A/0165The demolition of existing dock leveller and ramp to unit 7A, the inst / 0.2 km away / 17 November 2017Granted
- FW21A/0005Construction of a high bay warehouse/storage facility to the north of / 0.2 km away / 04 March 2021Granted
- FW18A/0194The construction of 4 no. light industrial units with ancillary office / 0.2 km away / 17 September 2019Granted
- FW19A/0081Demolition of internal fixtures and fittings of ancillary offices to U / 0.2 km away / 18 July 2019Granted
- FW23A/0317The development will consist of the installation of a substation / 0.2 km away / 28 November 2023Granted