FW23A/0317: The development will consist of the installation of a substation building comprising of an ESB supply room and 1 no. switch room (c. 46 sq.m) within a planning application area of c 0.0046 Ha.
Rosemount Business Park, Ballycoolin Road, Dublin 11, D11 K2TP
DecisionGrant permission
Decided28 November 2023
Application typePermission
Source documents6
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Chief Executives OrderSource: planningapi.agileapplications.ie / FW23A_0317_CE.pdf / Document 896644Source PDF
- Final GrantSource: planningapi.agileapplications.ie / FW23A_0317.pdf / Document 903654Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW23A_-_0317_WS.pdf / Document 893871Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW23A-0317_Uisce_Éireann.pdf / Document 894029Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW23A_-_0317_Parks.pdf / Document 895566Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW17A/0165The demolition of existing dock leveller and ramp to unit 7A, the inst / 0.1 km away / 17 November 2017Granted
- FW21A/0005Construction of a high bay warehouse/storage facility to the north of 7B for use as 'Goods Outward' building, all ancillary to the use of the existing buildings and activities on site. / 0.1 km away / 04 March 2021Granted
- FW19A/0081Demolition of internal fixtures and fittings of ancillary offices to U / 0.1 km away / 18 July 2019Granted
- FW24A/0466EPlanning Permission is sought for Alterations to an existing granted planning application Reg. Ref. FW21A/0111 for a proposed Tanker Washing Facility with ancillary Office and Staff Facilities at Cappagh Road, Cappagh Corporate Park, Ballycoolin, Dublin 11, Co. Dublin. The subject alterations for which Planning Alterations is sought for are as follows: 1.A. Reconfiguration of the floor plan areas and inclusion of a pump house, 48m2, 4.15m high, to rear (Northern) yard. Totalling 329m² additional floor area with a total area increase from 1,214m² (previously permitted) to 1,543m² (proposed). 2.A. Elevations alterations associated with above floor area adjustments; B. Proposed 2 No. non-illuminated company logo signage, 3.80m x 2m each, total area of 15.20m2 located 9m above ground floor level on the eastern & western building elevations. 3.Site plan alterations as follows: A. Inclusion of Truck Wash bays to the western boundary; B. Reduction in HGV parking spaces from permitted 34No to 10No HGV parking spaces to the eastern boundary; C. Provision of 2No. Water Tanks 5.00m diameter, 5m high, effective capacity = 98m3 each, to rear (Northern) yard, which will serve the facility building; D. Provision of additional 4No. covered bicycle parking spaces totalling 12No. covered bicycle parking spaces provided. E. Associated change of external surface finishes, landscape and drainage adjustments due to the inclusion of the alterations above; 4.A. Provision of 264No. Solar PV Panel modules with overall area of 570m² to the facility roof only. All other details will remain as per the granted application reg. ref. FW21A/0111. / 0.1 km away / 14 January 2025Granted
- FW21A/0111Permission for a HGV Parking and Tanker Washing Facility, the proposed development will consist of the following: (1) Facility building consisting of: (a) 3 no. Tanker Wash Bays for internal washdown of HGV Tankers (488m², 10.40m high). (b) Associated plant room with pumps and water treatment (241m², 10.57m high). (c) Workshop for maintenance and repair of HGV's (329m², 10.57m high). (d) Attached ancillary single storey Office/Staff facility accommodation (147m², 5.40m high). (2) Secure parking for 34 no. HGV's over a net area of 2,142m² with access and ancillary marshalling areas. (3) Ancillary car parking for 12 no. vehicles and 8 no. bicycle parking spaces. (4) ESB Sub-station 9.0m², 3.0m high located at previously granted cul de sac access road. This development will also include site fencing, HGV and pedestrian gate, boundary treatment - landscaping, paving, external lighting, provision of services and utilities including foul sewer and surface water management facilities. The subject site will be accessed from an existing cul de sac road connected to the existing roundabout on Cappagh Road as previously granted planning permission under FCC file reg. ref. FW19A/0231. AI received 18/02/2022 / 0.1 km away / 16 March 2022Granted
- FW26A/0021EThe application relates to development located on a site that will comprise or will be for the purposes of an activity requiring an Industrial Emissions Licence. The application for planning permission relates to an existing and permitted [Permission Ref. FW17A/0167 (for demolition of existing warehouse and construction of 3 no. data centres and associated works), permission Ref. FW18A/0114 (Amendments to the permitted 3 no. data centres and associated works), permission FW24A/0246E (Amendments to permitted plant yards, energy centres, loading areas and ancillary works)] data centre development. Permission is sought for construction of a data centre building [DUB01b] which will result in the amalgamation of the permitted DC2 and DC3 buildings [FW17A/0167 & FW18A/0114] and include the provision of the permitted Energy Centre EC3 [FW24A/0246E]. The data centre building will include data halls, offices, staff areas, storage areas, plant areas, roof plant, solar PV at roof top level and green roof above office space. The building will have a maximum parapet height of 15.07m. The total floor area of the proposed DUB01b is c.22,295 m2. EC3 will have a gfa of c. 1433m2, parapet height of 12.67m and flues height of 28.0m. Permission is also sought for a 10MVA/38kV substation with a maximum height of c.4.5m and gfa of 173m2, substation maintenance access, heat recovery infrastructure, carpark area with c. 57no. carspaces including 3no. accessible car spaces, and 24 no. EV car parking spaces with charge points. A total of 48no. covered bicycle spaces are also proposed. Permission is also sought for all landscaping (including biodiversity area), drainage, waste storage area, internal and external accessways. The development will be completed within five years of the date of the permission being sought. / 0.1 km away / 13 March 2026Granted
- FW10A/0167Change of use of existing premises from plant hire use to metal recycl / 0.2 km away / 17 February 2011Granted
- FW24A/0246EThe application for planning permission consists of modifications to permission Ref. FW17A/0167 (for demolition of existing warehouse and construction of 3 no. data centres and associated works) and permission Ref. FW18A/0114 (Amendments to the permitted 3 no. data centres and associated works). The proposed modifications will comprise the following: Revised layout of Plant Yard No. 1 to provide a new gas pressure reduction station (GPRS), revised Energy Centre, modifications to permitted flue design, and alteration of HV Building to MV building and revised design; Revised layout of Plant Yard No. 2 to provide revised Energy Centre, modifications to permitted flue design, fuel storage tanks, and combined services building; Revised layout of Plant Yard No. 3 to provide revised Energy Centre, modifications to permitted flue design, and alteration of HV Building to MV building and revised design, new battery energy storage system (BESS); Modifications to internal access and landscape areas to accommodate redesigned Plant Yards; Ancillary infrastructure including revised sprinkler tank and pumphouse location; Minor modifications to rear loading of Buildings No. 1, 2 and 3; and All associated works ancillary to the modifications. The proposed modifications will also include a temporary energy generation compound for a period of c. 1.5 year. The temporary modifications include: Installation of 4 no. gas powered generators and 4 no. bio diesel (HVO) generators (including biodiesel storage) used in standby application; Each generator will include a 12 m tall flue stack; 2 no. Battery Storage area and a Battery inverter station; Installation of 6 no. containerised switchgear rooms and 6 no. Transformers; and ancillary equipment including fuel interceptor. Following the temporary period, Data Centre building No. 2 will be developed in accordance with the layout and design as permitted by FW18A/0114 including the modifications proposed in this application. The temporary works will be removed once Energy Centre No. 1 and 2 have been commissioned. The remainder of the development is to be carried out in accordance with parent permission Reg Ref. FW17A/0167, Amendment permission FW18A/0114, and any subsequent amendments permitted by this application for planning permission. / 0.2 km away / 24 July 2024Granted