Undeveloped site at Cappagh Corporate Park, Cappagh Road, Ballycoolin,
Planning application FW19A/0231
DecisionGrant permission
Decided23 June 2020
Application typePermission
Source documents10
Site
What is on file
0refusal reasons22conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development carried out in accordance with lodged plans/specs and AI received 22 May 2020.Compliance
- 2Landscape Masterplan & Planting Plan (Dwg CCZ-JBAI-00-00-DR-L-0001) implemented in full; 2-year replacement of dead/damaged planting; Landscape Architect retained for supervision and sign-off.Landscaping Boundary
- 3Cycle parking covered/secure; tactile paving aligned; STOP signing/markings at new and existing estate access; works at developer expense.Traffic Access
- 4Prevent spillage/deposit of materials on adjoining roads; developer responsible for full cost of road damage repair.Construction Management
- 5Underground/overhead services and poles relocated to adjacent boundary at developer's expense.Construction Management
- 6Lighting deflected downwards, cowled on buildings, switched on only during operation.Design Materials
- 7Bathrooms fitted with permanently maintained obscure glass (film not acceptable).Design Materials
- 8Apply for and sign Irish Water connection agreement prior to commencement; adhere to agreement standards.Water Services
- 9Construction hours restricted to Mon-Fri 0800-1900, Sat 0800-1400; no work Sun/Bank Holidays; deviations require prior written approval.Construction Management
- 10Comply with BS.5228 for noise/vibration; all equipment fitted with silencers/acoustic covers.Construction Management
- 11Noise/vibration monitoring during construction; implement mitigation if limits exceeded.Construction Management
- 12High impact work (piling, rock breaking, etc.) restricted to 10am-4pm Mon-Fri; adequate acoustic screening provided.Construction Management
Planning a project near Undeveloped site at Cappagh Corporate Park, Cappagh Road, Ballycoolin,?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 105 pages of searchable text on file.Included in site brief
10 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 8 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
10 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- FW21A/0111Permission for a HGV Parking and Tanker Washing Facility, the proposed / 0.1 km away / 16 March 2022Granted
- FW24A/0466EWe BP McKeefry (Ireland) Limited intend to apply for Planning Permissi / 0.1 km away / 14 January 2025Granted
- FW10A/0167Change of use of existing premises from plant hire use to metal recycl / 0.2 km away / 17 February 2011Granted
- FW24A/0521EThe development will consist of the installation of a replacement asph / 0.2 km away / 17 June 2025Granted
- FW24A/0325EThe proposed development will consist of (i) Change of use of existing / 0.2 km away / 25 November 2024Granted
- FW19A/0081Demolition of internal fixtures and fittings of ancillary offices to U / 0.2 km away / 18 July 2019Granted
- FW21A/0005Construction of a high bay warehouse/storage facility to the north of / 0.2 km away / 04 March 2021Granted
- FW23A/0317The development will consist of the installation of a substation / 0.2 km away / 28 November 2023Granted