Dublin Airport Logistics Park, St Margaret's Road, St Margaret's, Co.
Planning application FW20A/0209
DecisionGrant permission
Decided16 February 2021
Application typePermission
Source documents14
Site
What is on file
0refusal reasons22conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development to be carried out in accordance with approved plans and conditions.Compliance
- 2Use restricted to Warehouse/Industrial with ancillary offices; changes require permission.Occupancy
- 3Details of signage to be submitted and agreed; signage limited to individual lettering fixed to parapet wall/facade and back lit; no signage panels permitted.Design Materials
- 4Employee and visitor numbers to comply with Dublin Airport Outer Public Safety Zone restrictions.Occupancy
- 5Surface water management proposals to include green options; no surface water discharge to foul sewer; drainage to comply with regional code of practice.Wastewater Drainage
- 6Car parking reduced to Development Plan maximums; cycle parking increased and to be covered and secure; revised site layout plan to be submitted.Traffic Access
- 7Landscaping requirements including tree planting distances from lamp standards and grass margin widths; landscaping to be completed by first planting season after development.Landscaping Boundary
- 8Crane use during construction to be agreed in writing with Irish Aviation Authority and Dublin Airport Authority.Other
- 9Archaeological monitoring of groundworks required; procedures if archaeological material found; reporting to Planning Authority and Department of Housing, Local Government and Heritage.Archaeology Heritage
- 10Prior to commencement, submit predicted noise environment, demonstrate internal noise levels achievable, and propose noise mitigation measures.Design Materials
- 11Submit plan for off-site disposal of construction/demolition waste; manage hazardous soil; bunding for fuel/chemical tanks; waste storage in designated compound.Construction Management
- 12Submit Construction Traffic Management Plan prior to commencement.Construction Management
Planning a project near Dublin Airport Logistics Park, St Margaret's Road, St Margaret's, Co.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 83 pages of searchable text on file.Included in site brief
14 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 9 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
14 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- FW22A/0262The introduction of ancillary accomodation and office space at second / 0.0 km away / 05 January 2023Granted
- FW25A/0306EThe development consists of the material change of use from warehouse / 0.1 km away / 04 November 2025Granted
- F17A/0728The construction of a single storey unit for industrial and/or warehou / 0.1 km away / 26 January 2018Granted
- F17A/0705The construction of a standard two room electrical substation to the r / 0.1 km away / 16 January 2018Granted
- F16A/0598The development will consist of a 40 m access road off Maple Avenue; a / 0.1 km away / 23 February 2017Granted
- F17A/0664The construction of a single storey unit for Industrial and/or Warehou / 0.1 km away / 18 December 2017Granted